Laserfiche WebLink
Total Coinment markets h" quality <br /> environ ental protection pro ucts_fo.r . <br /> your secondary containment <br /> Bulkhead Fittings Dis,-,+ser Sumps and Pans Liquid-tight Sump/Risers Double-Wall underground Storage <br /> Tanks <br /> Guide Specifications <br /> Short Form Structural Integrity: The outer secondary contain- <br /> The contractor shall provide the Enviroflext Double-Wall ment system shall be of such design and materials to <br /> piping system, as manufactured by Total Containment, have sufficient strength to withstand the maximum <br /> Inc. Both the primary and secondary piping systems shall underground burial loads and tested in accordance <br /> be installed and integrity tested in accordance with the with AASHTO M294. The flexible inner primary pip- <br /> manufacturer's published installation instructions. ing system shall be capable of withstanding liquid <br /> pressure five times greater than the designed operat- <br /> Long Form ing pressures. <br /> Design:The Double-Wall Piping System shall consist of Integrity Testing: The outer secondary containment <br /> a UL/ULC listed flexible inner primary pipe contained systems shall undergo an air pressure hold test (3 to <br /> within a ULC listed flexible outer containment pipe,each 5 psi) after installation and before the final backfill. <br /> making connection within a series of surface access The flexible inner primary piping system shall be sub- <br /> containment chambers.All piping runs shall be continu- ject to 60 psi air pressure hold test prior to final back- <br /> ous, whereby there shall be no fittings or piping con- fill. <br /> nections, for either the primary or secondary contain- Monitoring Capability:_ The design of the secondary <br /> ment pipe which are not visible or accessible from containment system shall permit any leak in the pri- <br /> aboveground. The secondary containment piping shall mary piping system to be detected by a leak detection <br /> be sized to allow complete removal of the primary piping system. <br /> without excavation. The secondary containment system Access Chambers: Surface access containment <br /> shall provide watertight containment of the tank's piping chambers shall be located at the tank containing the <br /> and its associated fittings,and the shear valve assembly tank's submersible pump and under each above- <br /> located below each aboveground fuel dispenser unit. ground fuel dispenser. These access chambers shall <br /> Product Compatibility: All the components of the meet the following requirements: <br /> Double-Wall Piping System shall be compatible with the 1, Provide product-tight tank or island connection. <br /> products to be stored. 2. Provide product-tight pipe and conduit exits. <br /> Corrosion Resistance: All components of the Double- 3. Provide sufficient strength to keep out <br /> Wall Piping System shall be made of non-corrosive surrounding backfill material. <br /> materials, or if metallic, such as the fittings and cou- 4. Made of non-corrosive, product compatible and <br /> plings, isolated from corrosion causing agents. dielectric materials. <br /> i <br /> j <br /> h <br /> 1 <br />