Laserfiche WebLink
.,.JAN -27-97 MON 6:04 PM ARONSO GINEERING FAX NO. 916 63J637 P. 2 <br />r-24— 1997 12 1 56PM FROM Ri-q--ACCT 707+765+1104 P 4 <br />Project <br />1. Submission of Sail Ea&fty's CaMyoction R widda 30 dg" of project coMpleuva, or <br />2. Submispion of vghfcazion. e.g., load ticket, wl" 30 days of project completion that one of the Wowing =tcrlals was <br />Placed in the cxcavallon 12 12' litu; <br />A. Pea gravvi—savoib. rounded matenal = mom than one-Wf (1/2) ipca in diamin <br />9. Crushad rock—self-compWWI ' mwjw <br />= more tha three-quam" (3/4) Inch 40 M" WUg" <br />MUFUMM'Mt. (Use of =k will uot be pc tied for bvJdUl it conuia will be made between the <br />backfill material ad ta"pipes made of poly is glam of similar amgrigls) <br />fdWu- bad <br />mom <br />