My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
907
>
2300 - Underground Storage Tank Program
>
PR0231871
>
COMPLIANCE INFO_1998-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:51:51 PM
Creation date
6/23/2020 6:53:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2008
RECORD_ID
PR0231871
PE
2361
FACILITY_ID
FA0003968
FACILITY_NAME
AT&T California - UE046
STREET_NUMBER
907
Direction
W
STREET_NAME
LINCOLN
STREET_TYPE
Rd
City
Stockton
Zip
95207
APN
077-470-07
CURRENT_STATUS
01
SITE_LOCATION
907 W Lincoln Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231871_907 W LINCOLN_1998-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
354
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION Moi' <br /> PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. M02. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) Pacific Bell Telephone Company dba AT&T California UE046/SKTNCAI I MU3. <br /> BUSINESS SITE ADDRESS 907 LINCOLN ROAD Moo. CITY STOCKTON Mos' <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY Mob. ❑ 99.OTHER(Specify): M02 <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor,line leak <br /> detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification form,Hazardous <br /> Materials Business Plan map,etc.)which shows all Muired information,include it with this Elan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) MTU- <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.VACUUM M11. <br /> PANEL MANUFACTURER: Veeder Root M12. MODEL#: TLS-350 M13. <br /> LEAK SENSOR MANUFACTURER: Veeder Root M14 MODEL#(s):794390-420 Mts. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: MI6. MODEL#: M17. <br /> IN-TANK PROBE MANUFACTURER: MIx. MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M20. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. c.OTHER(SP(Specify): M22.M23 <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26.M27 <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency spin..) <br /> ❑ 99.OTHER(Specify): Mex. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao. <br /> ® I.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.VACUUM M31. <br /> PANEL MANUFACTURER: Veeder Root M32. MODEL#: TLS-350 M33. <br /> LEAK SENSOR MANUFACTURER: Veeder Root M14' MODEL#(s): 794380-208 M35' <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a.YES ® b.NO M36. <br /> WILL FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ® b.NO M37. <br /> ❑ 2. MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF PRODUCT FLOW <br /> WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): Max' MODEL#(S): M.N. <br /> ❑ 3. ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M40. MODEL#: M41. <br /> PROGRAMMED IN LINE TESTING: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45.M46. <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY [] b.WEEKLY' ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED-; M49. <br /> •Requiresagency approval ••Allowed for monitoring of unburied emergency generator fuel piping only per HSC 4252x 1.5(b)(3) <br /> [36.SUCTION PIPING MEETS EXEMPTION CRITERIA PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) M49, <br /> hwfwrc-d(9/24/04)-2/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.