My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
907
>
2300 - Underground Storage Tank Program
>
PR0231871
>
COMPLIANCE INFO_1998-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:51:51 PM
Creation date
6/23/2020 6:53:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2008
RECORD_ID
PR0231871
PE
2361
FACILITY_ID
FA0003968
FACILITY_NAME
AT&T California - UE046
STREET_NUMBER
907
Direction
W
STREET_NAME
LINCOLN
STREET_TYPE
Rd
City
Stockton
Zip
95207
APN
077-470-07
CURRENT_STATUS
01
SITE_LOCATION
907 W Lincoln Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231871_907 W LINCOLN_1998-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
354
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-HEALTH & SAFETY' 2007 <br /> A Photo Ionization Detector (PID) Instrument, such as a Mini Rae 2000, or equivalent, will be <br /> used to identify levels of hexane in job site soil while performing excavations. A four-gas <br /> meter will be used to identify any atmospheric deficiencies in oxygen, lower explosive limits, <br /> and any potential for toxic vapors, such as carbon monoxide or hydrogen sulfide, in the work <br /> areas. <br /> 7.5 DECONTAMINATION REQUIREMENTS <br /> PERSONNEL: <br /> All personnel leaving the active work area will be required to decontaminate personal <br /> protective clothing in the Decontamination Zone prior to leaving the site for breaks, lunch or <br /> end of work shift. The following operations, appropriate to protection level, are to be <br /> accomplished for decontamination. Wash boots and outer gloves in TSP and water, rinse and <br /> remove outer gloves. Remove and bag Tyvek. If cotton coveralls are used, remove and bag <br /> prior to rewearing. If worn, remove respirator, and wash in TSP and rinse in water. Remove <br /> surgical gloves and dispose in a plastic trash bag. Wash hands and face. Take a shower and <br /> wash hair as soon as possible after leaving site. <br /> Materials required for this decontamination will consist of: plastic sheeting, polyethylene bags, <br /> sufficient water for soaping and rinsing, several large tubs, TSP soap, brushes, hand soap <br /> toweling, and drums. <br /> HEAVY EQUIPMENT: <br /> The Contractor will decontaminate all contaminated equipment utilized before it is used at <br /> another locale, or before the equipment leaves the site. Any contaminated material, other <br /> than soil samples will be placed in metal drums or covered in plastic and stored on site, <br /> according to Federal, State and Local Regulatory Agencies, until the material is analyzed for <br /> future disposal. <br /> The following equipment/materials could be utilized for decontamination of the heavy <br /> equipment: 55-gallon drums, polyethylene bags, labels and signs, trough/wash area, and <br /> portable steam cleaner. <br /> 7.6 SAFETY EQUIPMENT <br /> While the UST excavation activities are in progress, the subcontractor is to provide a First-Aid <br /> Kit, eyewash kilt, fire extinguisher, and sorbent material for personnel at a site being worked. <br /> 7.7 WORK LIMITATIONS <br /> 11/07/2005 revision 5 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.