Laserfiche WebLink
The D-TECT I system is installed with no downtime in only 11/2 <br />to 4 hours, and can be easily adapted to existing safety systems. <br />Although each D -TELT I system is custom -fitted for its particu- <br />lar application, the basic steps for a typical installation are <br />DININ shown below. <br />Any void spaces are filled <br />with silicone sealant, <br />which is also applied to <br />the two halves of the <br />D-TECT I body. The <br />body halves are then <br />fitted to the pipe, and <br />six assembly bolts are <br />inserted. <br />