Laserfiche WebLink
NEW UST'l TALLATION INSPECTIONRECORD <br />TANK#,•! •UL# TANK MMEL/14ATERIAL:^,. <br />m <br />i <br />INITIAL INSPECTIONS <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br />4. PRIMARY TANK TEST: PSI: HRS/MIN: <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />PIPING INSPECTIONS <br />A <br />I <br />(CCR 2632 (C) (2)) <br />Y <br />P <br />N <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (A)) <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />R <br />T <br />(CCR 2635 (8) (5)) <br />0 <br />1 <br />(CCR 2635 (B) (6)) <br />V <br />A <br />(CCR 2635 (E) (2)) <br />E <br />L <br />(CCR 2631 (D) (5)) <br />D <br />S <br />(CCR 2635 (A) (5)) <br />20. <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />21. <br />"C" FORM COMPLETED AND SUBMITTED <br />(CCR 2635 (E)) <br />22. <br />MONITORING METHW FOR ALL TANKS AND PIPING APPROVED <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br />23. <br />LL2. <br />UST INSTALLATION PLANS APP (CCR 2635 (E) (5)) <br />INITIAL INSPECTIONS <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br />4. PRIMARY TANK TEST: PSI: HRS/MIN: <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />PIPING INSPECTIONS <br />FINAL INSPECTION <br />1.12. <br />6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) (CCR 2635 (B) (4)) <br />(CCR 2632 (C) (2)) <br />Y <br />7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCR 2635 (A) (4)) <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR 2632 (A) (2)) <br />8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (A)) <br />14. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />15. <br />10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br />(CCR 2635 (8) (5)) <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br />FINAL INSPECTION <br />COMMENTS: <br />EH23-006 3/92 <br />1.12. <br />PERFORMANCE TEST FOR "Alt" MONITORING PRMS <br />(CCR 2632 (C) (2)) <br />Y <br />. 13. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR 2632 (A) (2)) <br />14. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />(CCR 2632 (D) 2635 (B) (5)) <br />15. <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />(CCR 2635 (8) (5)) <br />16. <br />BALL FLOAT VALVES INSTALLED <br />(CCR 2635 (B) (6)) <br />17. <br />OVERFILL PROTECTION INSTALLED/ <br />(CCR 2635 (E) (2)) <br />18. <br />TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) <br />(CCR 2631 (D) (5)) <br />19. <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR 2635 (A) (5)) <br />20. <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE <br />(CCR 2632 (E) (1) (2)) <br />21. <br />"C" FORM COMPLETED AND SUBMITTED <br />(CCR 2635 (E)) <br />22. <br />MONITORING METHW FOR ALL TANKS AND PIPING APPROVED <br />(CCR 2641-2644) <br />23. <br />ALL CONDITIONS MET! FACILITY PERMIT ISSUED <br />(H+S CODE 25284 (E) (F)) <br />COMMENTS: <br />EH23-006 3/92 <br />