My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_1986-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2024 1:44:19 PM
Creation date
6/23/2020 6:53:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2000
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_1986-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I I I MT�, � <br />Name of ATGS- EAS 1_141 -Iru-- <br />Version i <br />Umitations on the Results <br />•' # - <br />0 The method has not been substantially changed. <br />• The vendor's instructions for installing and operating the ATGS are followed. <br />I <br />• The tank contains a product identified on the method description form. <br />• The tank is no larger than 15.000 . gallo <br />• The tank is at least 50 - percent full' r <br />o The waiting time after adding any substantial amount of product <br />to the tank is 4.1 - hours. <br />• The temperature of the added product does not differ more than <br />6.8 degrees Fahrenheit from that already in the tank. <br />• The total data collection time for the test is at least 3.6 hour <br />• Other limitations speced by the vendor or determined during testinj <br />> Safety disclaimer: This test procedure only addresses the Issue of the ATG system's <br />ability to detect leaks. It does not test the equipment for safety hazards. <br />Certification of Results a <br />Z 0 0 0 Z <br />0 - 0 Z <br />J.D. Flora, Jr./G. Joe Hennon Midwest Research Institute <br />Zprinted name) (o-rganiii-t"Ro—npertorming evaluation) <br />ri�'1 Kansas Citx, MO 64110 <br />(bignature)(Eistate, zip) <br />.1 (816) 753-Z60P <br />ate i (phone number) <br />ATGS - Results Form Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.