Laserfiche WebLink
8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br />C. <br />b. TanklPlping Hauler. <br />Name <br />Address zip <br />Phone No4 <br />Hauler`'' <br /># Of hauled as hazardous)—Z---/� <br />— ---1 <br />C. /-Iankmvin isposai site: <br />Address 4 Lit; ct r city zip <br />Phone No.( 0-61i - )�9- 6?,3 2E . <br />EPA IDN (if transported to a permitted TSD facility) /L/ <br />9. Is the sampling firm an independent third party from the contractor? YES W-- 'NO <br />9a. Describl in detail, how the soil and/or water sample(s) beneath the tank and piping will obtained: <br />lo. Describe how the excavation will be backfilled with suitable material upon removal: <br />77L R--Avlv 1.4j, C!SQ;� Q14 77.L, <br />C- <br />11. Handling of excavated soil: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />61-1 Pi —n <br />b) What will be the final destination of the excavated stockpile? <br />AAd) <br />c) Contaminated Soil Hazardous Waste Hauler. <br />Name <br />Hauler Registration# <br />Address ��'jtipz i.5L'koe clty� zip <br />Phone No. ( 5-1l"' ) a 1> � — / --w' <br />EH 23 046 (Revised 10/19198) Page 5 <br />