Laserfiche WebLink
0 e R" h F. (; F. I V E: U <br />Monitoring System Certification FEB 17 2016 <br />F. In -Tank Gauging / SIR Equipment: M Check this box if tank gauging is used o *'-r <br />❑ Check this box if no tank gauging or SIR equiprrieh is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or win ne correciea. <br />G. Lane Leak Detectors (LLD): <br />❑ Check this box if LLDs are not installed. <br />6.Vlll JPJ 1G LG <br />M Yes <br />LIAG AVA.V 9V.. <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: M 3 g.p.h.; ❑ 0.1 g.p.h ; [10.2 g.p.h. <br />M Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />M Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />M Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />M N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />M N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />M N/A <br />or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />M N/A <br />M Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or win ne correcrea. <br />H. Comments: <br />Page 3 of 3 <br />