My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2005-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:24 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2018
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2005-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 e R" h F. (; F. I V E: U <br />Monitoring System Certification FEB 17 2016 <br />F. In -Tank Gauging / SIR Equipment: M Check this box if tank gauging is used o *'-r <br />❑ Check this box if no tank gauging or SIR equiprrieh is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or win ne correciea. <br />G. Lane Leak Detectors (LLD): <br />❑ Check this box if LLDs are not installed. <br />6.Vlll JPJ 1G LG <br />M Yes <br />LIAG AVA.V 9V.. <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: M 3 g.p.h.; ❑ 0.1 g.p.h ; [10.2 g.p.h. <br />M Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />M Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />M Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />M N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />M N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />M N/A <br />or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />M N/A <br />M Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or win ne correcrea. <br />H. Comments: <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.