Laserfiche WebLink
ra <br />ENVIRONMENTAL DEPARTMENT <br />SAN JOAQUIN COUNTY <br />a ?� Donna K. Heran, R.E.H.S. <br />Director 304 East Weber Avenue, Third Floor <br />Al Olsen, R.E.H.S. Stockton, California 95202-2708 <br />c .;a <br />Program Manager <br />q<<F®.R�� gTelephone: (209) 468-3420 <br />Laude A. Cotulla, R.E.H.S. <br />Program Manager Fax: (209) 464-0138 <br />March 19, 2003 <br />Elite IV Contractors <br />Jeanie Webb <br />2535 Wigwam DR <br />Stockton CA 95205 <br />Re: Country Side Mini Mart <br />14971 N. Hwy 88 <br />Unit Supervisors <br />Carl Borgman, R.E.H.S. <br />Mike Huggins, R.E.H.S., R.D.I. <br />Douglas W. Wilson, R.E.H.S. <br />Margaret Lagorio, R.E.H.S. <br />Robert McClellon, R.E.H.S. <br />Mark Barcellos, R.E.H.S. <br />The permit application to repair 3 inch Ameron 2 piece clamshell on 3 inch secondary <br />unleaded line has been approved with the following conditions: <br />1. Submit a copy of equipment manufactures training certification prior to <br />beginning work. <br />2. All metal exposed to backfill must have corrosion protection. <br />3. Soil sampling may be necessary per Environmental Health assessment. <br />4. A line integrity test on the primary piping of all exposed lines must be performed <br />by a certified technician and results received by this office within 7 days after <br />work completion. <br />5. If concrete is broken near the underground storage tank a tank integrity test must <br />be performed by a certified tank tester and results received by this office within 7 <br />days after work completion. <br />6. A 24-hour lake test, or equivalent will be required on any sumps that require <br />repair/replacement. <br />7. EHD must witness a 30 -minute pressure test on all repaired/replaced piping prior <br />to backfill. <br />8. Give 48-hour notice for all inspection appointments. <br />If you have any questions, please call Dennis Catanyag, at (209) 468-3459. <br />Thank you, <br />ennis P <br />S <br />Environmenta Specialist <br />