My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14971
>
2300 - Underground Storage Tank Program
>
PR0231911
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
6/23/2020 6:53:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231911
PE
2361
FACILITY_ID
FA0000540
FACILITY_NAME
COUNTRYSIDE LIQUORS & GAS
STREET_NUMBER
14971
Direction
N
STREET_NAME
STATE ROUTE 88
City
LODI
Zip
95240
APN
06316025
CURRENT_STATUS
01
SITE_LOCATION
14971 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231911_14971 N HWY 88_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT ©RREPAIR <br />(Submlt minimum of 3 sets of plans & applications as originals will'be retained by EHD). <br />1. Site map enclosed? YES [ ] NO <br />2. Submit--copies-of-ICC.-Service : Technician and/or.Installer:s certtflcate and-all_manufagturer training cerhflcates_lbr;each <br />person installing or testing any component that is repaired or replaced: Ensure a copy of the "Site Health and Safety <br />Plan". is..availableon the )obsite. as. required by Title 8.- <br />3. Detailed description of work'to,be completed. List components to be repaired .r replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done: (If <br />pdding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST installation Application <br />pages 4-8 as necessary for a timely plan review): <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.