Laserfiche WebLink
C�7 <br />A 6frrLER-RYAN INC. <br />GR Job # 20-591947 <br />F. In -Tank Gauging / SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if In -tank gauging equipment is used to perform leak detection monitoring. <br />Comnleto tho fnilnurinn rhwrklist- <br />9 <br />yes <br />1 ❑ <br />o <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />[j <br />Yes <br />1 ❑ <br />No" <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />ff <br />Yes <br />® <br />No" <br />Was accuracy of system products level readings tested? <br />ff <br />Yes <br />❑ <br />No" <br />Was accuracy of system water level readings tested? <br />ry <br />Yes <br />I] <br />NW <br />Were all profs reinstalled property? <br />Ej <br />Yes <br />❑ <br />No* <br />Were all stems on the equipment manufacturees maintenance checklist completed? <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Comollete the following checklist: <br />rg <br />Yes <br />❑ <br />o <br />o -equipment start-up or annual equipment cern cation, was a leak simulated to verify D performance? (cherk all <br />❑ <br />NIA <br />that apply) Simulated leak rate: ® 3 g.p.h. ❑ 0.1 g.p.h. ❑ 0.2 g.p.h. <br />ff <br />Yes <br />❑ <br />No" <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />[j <br />Yes <br />❑ <br />No" <br />Was the testing apparatus properly calibrated? <br />❑ <br />Yes <br />❑ <br />No" <br />For Mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />E <br />NIA <br />ff <br />Yes <br />❑ <br />No" <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />WA <br />m <br />Yes <br />❑ <br />No" <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />❑ <br />NIA <br />Disconnected? <br />a <br />Yes <br />❑ <br />No" <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />® <br />NIA <br />fails a test? <br />Yes <br />No" <br />For electronic LLDs, have all accessible wiring connections 6Wn visually inspected? <br />NIA <br />r& <br />Yes <br />❑ <br />Ne <br />were all items on the equipment manufacturer's maintenance checklist completed? <br />In vie Section h, below, describe now and when these deficiencies were or will be corrected. <br />G. Comments: <br />Monitoring system Certification Page 3 of 4 12107 <br />0 <br />