My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2011-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 2:06:52 PM
Creation date
6/23/2020 6:53:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2013
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />GR Job # 20-591947 <br />Emergency Shut -Off (ESO) Testing Results & Checklist <br />I Co. Name: <br />7 w fremotn St --]—Phone — <br />�y I St: Stockton Lead Technician: Joey Mesa x I PASS <br />Maint W.O. # 9901796 Name: or <br />Passport: FAIL (Next Day Repair Required) <br />S' nature <br />is objective of this test Is to provide assurance that the when the E -Stop switch Is activated, all the fueling system circuits (turbines, and dispensers) are do -energized, <br />main de -energized until they are reset manually). The test procedures and guidelines shall be In accordance with the E -Stop Testing Process. <br />The following I X TO Beim <br /># <br />g 1.1b..Von 1. to be completed. 1 7-- 1 =-T- <br />2 Type of Switch? Push Pull I Momentary Plain light/ Toggle Other: <br />(if Momentary type, locate and identify re -set button): In Elect Room <br />3 Type of Turbine Control Relay System (Electrical Distribution Center): <br />Brown Box Power Solution Other x Custom Fabricated <br />1�e of Turbine Control Relays: Make RggAk1fik&L_ Model =_U <br />Tvoe of Line Leak Detection: Mechanical ELD/CPT x PLL <br />6 Does the E -Stop shutdown power to the DISPENSERS <br />7 Does the E -Stop shutdown power to the TURBINES x <br />8 Is the 220 voltage to the turbine relay removed (either the line side or the motor side of the contacts or the coil)? x <br />9 Are the DISPENSER BREAKERS clearly identified / labeled? x <br />10 Are the TURBINE BREAKERS clearly identified / labeled? x <br />11 Are all the ESOs accessible and clearly identified / labeled? X <br />12 Fid the —ESO(s) function correctly (de -energized from either the line side or the motor side of the contacts or the coil)? L_X <br />12131 How was it corrected: <br />If repair or ESO functionality cannot be corrected same day (prior to leaving the site). The technician MUST notify the Site <br />Manager of the problem, place an "Out of Service" Tag on the ESO(s), and identify an alternate mean (i.e., locate circuit <br />panel , clearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br />Elite Customer Solution Center has been contacted for the repair. <br />eMaint. W.O. Ticket # <br />11 1 Site's fueling system is fully operational. x <br />12 1 All equipment secured and any access ports, lids, enclosures are closed. x <br />13 JAJI safety barricades, and any debris was been removed. x <br />completed copy with other documentation In E -Maintenance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.