Laserfiche WebLink
Eruyr-RYAN INC. GR .Job # 20-591947 <br />D. Results of Testing/Servicing <br />Software Version Installed: 332 <br />CnmelptR thn fnlln inn rhnn4lim!• <br />id es <br />® o <br />Is the audible alarm operational? <br />9 Yes <br />® No` <br />Is the visual alarm operational? <br />r Yes <br />® No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />r& Yes <br />® No" <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br />MOM operation? <br />® Yes <br />® No* <br />If alarms are relayed to a remote monitoring station, is all communication equipment (e.g. modem) operational? <br />rX N/A <br />Yes <br />i7 No` <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br />® N/A <br />detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check all that apply) <br />rx Sump/Trench Sensor, ra Dispenser Containment Sensor. Did you confirm positive shut -down due to leaks and sensor <br />failure/disconnection? [I Yes; ® No. <br />Yes <br />® No' <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention <br />® N/A <br />valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent <br />of tank capacity does the alarm trigger? 90 % <br />(i Yes <br />® No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all relacement its in Section E, blow. <br />ra Yes <br />® No <br />Was liquid found inside any secondary containmnt seystems designed as dry systems? (Check all that apply) ®product; ®Water. If <br />yes, describe causes in Section E, blow. <br />(i Yes <br />® No' <br />Was monitoring system set-up reviewed to insure proper settings? Attach set-up reports, if applicable. <br />Yes ® No' <br />Is all monitoring equipment operational per manufacture's specifications? <br />E. Comments: <br />replaced 871main stp sump sensor (323), also replaced 87 siphon fill sump sensor (3441, <br />small amount of liquid found in disp 3/ <br />Monitoring System Certification Page 2 of 4 12/07 <br />N <br />