Laserfiche WebLink
E <br />I <br />Station # Arco 5450 -Date 8/22 2013 <br />•.I 1 1. U01 I VATIVA <br />Test Information <br />This letter certifies that the annual leak detector tests were perfonned at the above referenced facility <br />according to the equipment manufacturers procedures and limitations and the results as listed are to my <br />knowledge true and correct. The mechanical leak test detector test pass/fail is determined using a low <br />flow threshold trip rate of 3 gph at 10 PSI. <br />Inspected By: Contractor Geftler-Ryan Inc. <br />Technician. Joey Mesa <br />Signature <br />Lic# <br />1 <br />2 <br />3 <br />4 <br />5 <br />Product <br />87 <br />91 <br />Manufacturer <br />VR <br />VR <br />Model <br />848480 <br />848480 <br />Full Operating Pressure (psi) <br />29 <br />28 <br />Line Bleed Back (ml) <br />NA <br />NA <br />Trip Time (see) <br />NA <br />NA <br />Metering Pressure (psi) <br />NA <br />NA <br />F/E Holding Pressure (psi) <br />21 <br />20 <br />Test Leak Rate (ml/min)(gph) <br />189ml <br />189ml <br />PASS or FAIL <br />P <br />P <br />This letter certifies that the annual leak detector tests were perfonned at the above referenced facility <br />according to the equipment manufacturers procedures and limitations and the results as listed are to my <br />knowledge true and correct. The mechanical leak test detector test pass/fail is determined using a low <br />flow threshold trip rate of 3 gph at 10 PSI. <br />Inspected By: Contractor Geftler-Ryan Inc. <br />Technician. Joey Mesa <br />Signature <br />Lic# <br />