Laserfiche WebLink
• 0 Page- _ of —7- <br />6. PIPING SUMP TESTING <br />Test Method Dcveloped By: ❑ Sump Manufacturer S Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum S Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Wayne Perry Inc. <br />Sum# # $7 S1P 1•la <br />Sump Diameter: &/6,11Y $ <br />77-,37 <br />Equipment Resolution: .0007" <br />Sump # 9 I Sump # <br />Sump Depth: <br />Sump Material:, <br />6 peGL ASS x <br />.tS l <br />t 1 <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />ZO <br />ZH <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />( <br />13 <br />7 <br />Condition of sump prior to testing: <br />Cn p p Q <br />1 L <br />1 t <br />Sump <br />Portion of Sum Tested <br />2" ABOVE HIGHEST <br />PIPING PENETRATION <br />2" ABOVE HIGHEST <br />PIPING PENETRATION <br />2" ABOVE HIGHEST <br />PIPING PENETRATION <br />2" ABOVE HIGHEST <br />PIPING PENETRATION <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />❑ Yes ❑ No SNA <br />❑ Yes ❑ No SNA <br />❑ Yes ❑ No SNA <br />❑ Yes ❑ No S NA <br />Turbine shutdown response time <br />NA <br />NA <br />NA <br />Is system programmed for fail-safe <br />shutdown?. <br />❑ Yes El S NA <br />El ❑ No S NA <br />❑ Yes El S NA <br />❑ Yes ❑ No S NA <br />Was fail-safe verified to be <br />o erational?* <br />❑ Yes []No S NA <br />❑ Yes ONO S NA <br />❑ Yes ❑No S NA <br />❑ Yes ❑ No S NA <br />Wait time between applying <br />pressurelvacuum/water and starting <br />test: <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />Test Start Time: <br />t O : 01 <br />O. 01 <br />9 <br />Initial Reading (RO: <br />6.53$0 <br />7• VV60 <br />7.7180 <br />Test End Time: <br />to 14 <br />10:217- <br />q %'S 1 <br />Final Reading (RF): <br />fa• 5,3S 1 <br />: 0000 <br />7.71cG$ <br />Test Duration: <br />15 Min <br />15 Min <br />15 Min <br />15 Min <br />15 Min <br />15 Min <br />15 Min <br />15 Min <br />Change in Reading (RF -RD: <br />QO�j <br />. y5`r5 <br />0.000.7 <br />1-0.0020 <br />Pass/Fail Threshold or Criteria: <br />-0.0020 <br />-0.0020 <br />-0.0020 <br />-0.0020 <br />-0.0020 <br />-0.0020 <br />-0.0020 <br />Tescsl�lt� <br />Anpass <br />] lEra <br />❑ 1 <br />Pass <br />` D F1 <br />C lE ❑ 11 <br />Was sensor removed for testing? <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ <br />No ❑ NA <br />❑ Yes ❑ <br />No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />57SVf' 040 1 .5trmie LSOK aN PEENE7--A7_j60_S <br />BP/Arco #05450 <br />1617 W Fremont <br />Stockton, CA. 95203 <br />N04732 — SB 989 Testing <br />