Laserfiche WebLink
PL=285.82' <br />1 - <br />>' PLANTER ` ®A <br />zI /' <br />m <br />INSTALLATION NOTES: <br />BEFORE START OF SAW CUTTING, REUEASURE TO CONFIRM THAT EXISTING MANHOLE FRAME IS NOT COMPATIBLE <br />WITH NEW MANHOLE UD. IF LID IS COMPATIBLE, DO NOT CUT UNTIL FIELD ENGINEER WAS CONFIRMED A NEED TO <br />REPLACE MANHOLE FRAME <br />01 CONTRACTOR TO SAW CUT 6' X B' MINIMUM SECTIONS OF EXISTING TANK SLAB AT HIGH MANWAY AS SHOWN. <br />2000NTRACTOR TO REMOVE EXISTING FILL SPILL BUCKETS. REMOVE OUSTING DROP TUBE FLAPPER VALVE (IF ANY), <br />AND ANY NON-EVR BALL FLOATS. <br />( CONTRACTOR TO INSTALL NEW EVR RISER ADAPTERS. <br />Q CONTRACTOR TO INSTALL NEW 5 GALLON SPILL CONTAINMENT BUCKETS AND MANHOLE W/ FRAME AT EACH TANK <br />FILL EVR VR -102-8 COMPLIANT. INSTALL NEW WATER SHIELD AND RISER SUPPORTS AT EACH FILL SUMP. <br />05 CONTRACTOR TO INSTALL NEW FILL DROP TUBE AND BALL FLOATS AT EACH. TANK. EAR VR -102-8 COMPLANT. <br />© CONTRACTOR TO INSTALL NEW RISER COMPONENTS AT EXISTING TANK GAUGE RISERS. FIELD VERIFY EXACT RESER <br />LDCATION. EVR VR -102-0 COMPLIANT. <br />(� CONTRACTOR TO INSTALL NEW PRESSURE VACUUM VENT VALVE AS NEEDED, AT EACH GASOLINE VENT RISER. <br />EVR VR -102-8 COMPLIANT. <br />Q CONTRACTOR TO PATCH ALL REMOVED CONCRETE TO MATCH EXISTING. <br />Q NOT USED. <br />4CID INSTALL NEW VEEDER-RODT OVERFILL ALARM W/ ACKNOWLEDGMENT SWITCH AND NEW AUTOMATIC TANK <br />GAUGING IF NOT EXISTING. <br />7Q CONTRACTOR TO INSTALL NEW RISER OFFSET AT VAPOR RISER TO OBTAIN 1B' O.C. FOR FILL AND <br />VAPOR RISEM (WHEN EXISTING S LESS TWIN 18' {1'O�.C. ONLY) C <br />V 1NTI S'►�2rL.. i A UC41L— �1 EAh\L sc.n. iZi Nt`= <br />Underground Service Alert <br />Call: TOLL FREE <br />1-800 FUELING <br />(9 227-2600 POSITIONS <br />NOZZLES <br />TWO WORKING DAYS BEFORE YOU DIG <br />�44 <br />Iln'('�' <br />EXIST. VEEDER-ROOT <br />TLS -350 MONITOR <br />EXIST. FILL SUMP (TYP.) <br />INSTALL NEW <br />OVERFILL ALARM W/ <br />SYSTEM <br />PL= 109.50' <br />_ - fl -!l - <br />_ _ _ _ <br />2 3 ¢ <br />S 8 g 11 <br />ACKNOWLEDGMENT EXIST. ' <br />SWITCH 10 RISERS <br />ui EXIST. <br />- - <br />- <br />a T.E. <br />(3) EXIST. U.G. <br />_ <br />o <br />0 O <br />a = <br />FUEL STORAGE <br />OEXIST.CANOPY <br />TANKS <br />EXIST. INTERSTITIAL <br />1 <br />URL <br />(TIP c <br />1 <br />(2K (12K) (1210 <br />Q•11 <br />O Q � <br />® <br />I�o <br />i <br />EXIST. <br />DIST• EXIST. P.I.C. UNI <br />E.S.O.(TIP OF 2) <br />1 <br />1 1 <br />TURBINE <br />EXIST. CANOPY SUMP (TYP� <br />1 <br />1 1 <br />COLUMN <br />EXIST. TANK SLAB <br />DOST•1 <br />1 <br />® ❑ .1 <br />EXIST. DRIVE SLAB <br />DISPENSERS <br />D <br />SLAND <br />1 1 <br />CO <br />(TYP.) <br />1 <br />`ie1403 . <br />,. EX�PRO�N <br />u <br />� <br />I <br />Pl.�2p1.61 <br />SIDEW� <br />i) <br />�15t. CONCRETE <br />G ` 20• <br />D 20• 1. 60• <br />❑ <br />AVENi1 <br />PL:111 I5T- CH <br />PROF <br />R�EMONT <br />GRAPHIC <br />SCALE <br />PL=285.82' <br />1 - <br />>' PLANTER ` ®A <br />zI /' <br />m <br />INSTALLATION NOTES: <br />BEFORE START OF SAW CUTTING, REUEASURE TO CONFIRM THAT EXISTING MANHOLE FRAME IS NOT COMPATIBLE <br />WITH NEW MANHOLE UD. IF LID IS COMPATIBLE, DO NOT CUT UNTIL FIELD ENGINEER WAS CONFIRMED A NEED TO <br />REPLACE MANHOLE FRAME <br />01 CONTRACTOR TO SAW CUT 6' X B' MINIMUM SECTIONS OF EXISTING TANK SLAB AT HIGH MANWAY AS SHOWN. <br />2000NTRACTOR TO REMOVE EXISTING FILL SPILL BUCKETS. REMOVE OUSTING DROP TUBE FLAPPER VALVE (IF ANY), <br />AND ANY NON-EVR BALL FLOATS. <br />( CONTRACTOR TO INSTALL NEW EVR RISER ADAPTERS. <br />Q CONTRACTOR TO INSTALL NEW 5 GALLON SPILL CONTAINMENT BUCKETS AND MANHOLE W/ FRAME AT EACH TANK <br />FILL EVR VR -102-8 COMPLIANT. INSTALL NEW WATER SHIELD AND RISER SUPPORTS AT EACH FILL SUMP. <br />05 CONTRACTOR TO INSTALL NEW FILL DROP TUBE AND BALL FLOATS AT EACH. TANK. EAR VR -102-8 COMPLANT. <br />© CONTRACTOR TO INSTALL NEW RISER COMPONENTS AT EXISTING TANK GAUGE RISERS. FIELD VERIFY EXACT RESER <br />LDCATION. EVR VR -102-0 COMPLIANT. <br />(� CONTRACTOR TO INSTALL NEW PRESSURE VACUUM VENT VALVE AS NEEDED, AT EACH GASOLINE VENT RISER. <br />EVR VR -102-8 COMPLIANT. <br />Q CONTRACTOR TO PATCH ALL REMOVED CONCRETE TO MATCH EXISTING. <br />Q NOT USED. <br />4CID INSTALL NEW VEEDER-RODT OVERFILL ALARM W/ ACKNOWLEDGMENT SWITCH AND NEW AUTOMATIC TANK <br />GAUGING IF NOT EXISTING. <br />7Q CONTRACTOR TO INSTALL NEW RISER OFFSET AT VAPOR RISER TO OBTAIN 1B' O.C. FOR FILL AND <br />VAPOR RISEM (WHEN EXISTING S LESS TWIN 18' {1'O�.C. ONLY) C <br />V 1NTI S'►�2rL.. i A UC41L— �1 EAh\L sc.n. iZi Nt`= <br />Underground Service Alert <br />Call: TOLL FREE <br />1-800 FUELING <br />(9 227-2600 POSITIONS <br />NOZZLES <br />TWO WORKING DAYS BEFORE YOU DIG <br />