Laserfiche WebLink
Site Address: 5450:1617 W FREMONT, STOCKTON, CA 9520 <br />air <br />1' <br />3 Date of Testing/SeMcing: U�-{ <br />Check this box if tank ging is us ed onlyfor inventory control. <br />Check this boxifn:o tank gauging or SIRsquipmant is installed, <br />This section must be completed if in -tank ,gauging equipment is used to perform leak detection monitoring. <br />Co>Kplete tke fbuows!g checklist: <br />Yes <br />M, No* <br />I Her,e,].litiputwisxngbeen inspected for proper entry and termination, including testing foc ground faults? <br />* Yes <br />No* <br />Were aU tank gauging probes visually inspected for damage and residue buildup? <br />Yes <br />No* <br />Was ac curacy of system product level readings tested? <br />'Yes <br />No* <br />Was ac curacy of system water level readings tested? <br />Yes <br />No* <br />Were all probes reinstalled property? <br />Yes <br />to No* <br />IWere all items on the equipment manufacturer's maintenance checklist completed? <br />w 1A IM MCUOK n, 9e1eW x 0es-crJ0 Roar 8Ad WJMX UM8 aenCleACM Wiese or will be corrected. <br />s <br />G. Line Leak Detectors ): Check this box if LLDs are not installed. <br />compleletketolulbo checklist: <br />Yea <br />Na* <br />NJA <br />For equipmant start-up or annual equipmcertifcati was a leak simulated to verify LLD performance? <br />(Check calf that apply) Simulated leak rate: 3 g.p h l; 0.1 g.p.h.1, 9 0.2 g.p.h? <br />Notes: I. Required for equipment start-up eriificaUon annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD tart -up. <br />im Yes <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />No* <br />Foxmechanicoll.Ms, does the LLD restrict product Row if it detects aleck? <br />N/A <br />Yes <br />No* <br />For electronic LLD9, does the turbine automatically shut off if the LLD detects a leak? <br />NIA <br />Yes <br />No* <br />For elo onic s, does the turbine automatically shut off if any p on of them 'ring systeim is disabled <br />NIA <br />orc d? <br />Yes <br />No* <br />For electronic L1.D9, does the turbine automatically shut off ifany portion of the monitoring syste.mmalfunctions <br />NIA <br />or &as a test? <br />YesNo* <br />For electronic LLDs, have all accessible wiring connections beenvisuallyinspected? <br />NIA <br />Yes <br />. No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />in the Section A, below, orvillbe corrected. <br />K Comments: <br />J <br />Page 3 of 3 0101 <br />