Laserfiche WebLink
S4Ite Health and Safe Plan <br />SITITJ �' <br />nnnnn Service Station # 000 <br />S. J. WEAVER <br />CONTRACTING ZZZZZ XXXXX, CA ccccc <br />2.4 Work Force <br />It is the responsibility of all employees to work in a manner that will prevent injury and exposure to <br />themselves and to other employees. Every employee is responsible for obeying safety rules and <br />regulations, and reporting unsafe conditions or acts to their supervisors. <br />3.0 SITE CHARACTERIZATION AND ANALYSIS <br />Some hazards are a function of the physical, or chemical nature of the site itself. Others are a direct <br />result of the work being done. <br />The overall health and safety hazard assigned to this project during construction activities at ARCO <br />service station # 000, is low to moderate. <br />3.1 Chemical Hazard <br />The primary chemicals of concern during construction activities at ARCO Service Station #000 will be <br />petroleum distillate fuels, which are mixtures of aliphatic and aromatic hydrocarbons. <br />Refer to the MSDS on site for the products at this location. <br />3.2 Route of Entry <br />A primary exposure route of concern at the site is inhalation of vapors during excavation. Air <br />monitoring, using direct -reading instruments for volatile organic compounds shall be performed during <br />work activities in contaminated areas. <br />Direct contact of the skin and eyes with liquid or dust is another important route of exposure. To <br />protect workers against skin exposure, they will wear specified protective clothing, respirators and <br />safety glasses for operations involving potential exposure to hazardous materials. Proper personal <br />decontamination procedures will be emphasized during remedial construction activities. <br />Although ingestion should be the least significant route of exposure, employees will be made aware of <br />ways in which this type of exposure can occur and methods to avoid such exposure. Deliberate <br />ingestion of chemicals is unlikely. <br />Personal hygiene habits, which provide a route of entry for chemicals, will be restricted. Proper <br />decontamination procedures will reduce/eliminate potential of ingesting hazardous materials. <br />Site personnel will wash their hands, face and other exposed parts of their skin before eating or <br />smoking. <br />3.3 Scope of Work <br />All work performed during construction activities at ARCO service station # 000 , will adhere to strict <br />safety procedures. S.J. Weaver Contracting Inc. will make provisions for and maintain a safe means <br />of exit from the work area for all employees. Prior to starting any work, all utilities in the work areas <br />will be identified and protected from accidental damage or contact. S.J. Weaver Contracting Inc. will <br />be responsible for the scope of work as it pertains to a particular site: <br />S.J. WEAVER CONTRACTING INC. <br />Page 5 <br />000-hasp.doc <br />