Laserfiche WebLink
3_ Pinina Leak Detection Monitorina Enuinment <br />Monitoring Method <br />Manufacturer <br />Model <br />Monitoring Frequency <br />Sump leak sensors connected to <br />Veeder Root <br />794380-208 <br />Continuous <br />continuous monitoring system <br />Specify type: <br />Veeder Root <br />794380-208 <br />Continuous <br />❑ Discriminating <br />Continuous <br />® Non -disc iminatin <br />Mechanical line leak detectors with <br />Visual inspection log maintained on site. <br />Daily <br />❑ Other: <br />No under -dispenser containment <br />programmed leak threshold of three <br />Every pumping cycle <br />gallons per hour <br />Electronic line leak detectors with <br />Red Jacket <br />CPT <br />programmed leak threshold of : <br />Every pumping cycle <br />0.1 aph 00.2 gph 03 gph <br />Line integrity testing by: <br />® Electronic line leak detector is <br />equipped to conduct line tightness <br />❑ Annually <br />testing <br />❑ Other: <br />❑ Third parry testing <br />Not required <br />❑ Other (Specify): <br />4. Disoenser Leak Detection Monitorina Eauioment <br />Monitoring Method <br />Manufacturer <br />Model <br />Monitorin 'Fre uenc <br />Mechanical float in dispenser <br />Continuous <br />containment <br />Electronic leak sensor in dispenser <br />Veeder Root <br />794380-208 <br />containment: <br />❑ Discriminating <br />Continuous <br />® Non -discriminating <br />❑ Visual inspection <br />Visual inspection log maintained on site. <br />Daily <br />❑ Other: <br />No under -dispenser containment <br />® Other (specify): Mechanical Float activates shear valve when leak detected. <br />5. Positive snutaown <br />Svstem does not have <br />Automatic pump shut off will occur whenever: <br />® Release is sensed in turbine sump <br />® Release is sensed in primary piping <br />® Release is sensed at dispenser <br />® Monitoring system is disconnected or fails in any way (fail safe) <br />❑ Other (specify): ,, <br />V <br />6. Secondary Containment Testin <br />U Secondary containment is not tested <br />In the State of California, secondary containment systems installed on or after January 1, 2001, shall be tested upon installation, <br />six months after installation, and every 36 months thereafter. Secondary containment systems installed prior to January 1, 2001, <br />shall be tested by January 1, 2003, and every 36 months thereafter. <br />7. Annual Equipment Certification/Testin <br />Annually <br />❑ Other (specify): <br />2 <br />