Laserfiche WebLink
. In -Tank Gauging / SIR Equipment: <br />Wate of Testing/Servicing: <br />❑ Check this box if tank gauging is used only for inventory control. <br />�Ccheck this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />uom tete the ionoW Ilig ullculunt. <br />❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe now ana wnen mese ueliclelicle3 Wel G Ul Wua Uc t.va a ca. . <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />%_onmwmpiete <br />Yes <br />the ionuw <br />❑ No* <br />Illy, cllet'.auast. <br />For equipment start-up or annual equipment cprfification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: 3 g.p.h.1; [10. 1 g.p.h.2; ❑ 0.2 g.p.h.2 <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />Y <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />2,>o* <br />N/A <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />*Yes <br />❑ N/A <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected? <br />Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />❑ N/A <br />malfunctions or fails a test? <br />Yes : <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />Ca�Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when tnese aenciencies were or will ue currecteu. <br />H. Comments: <br />