My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2023 11:46:22 AM
Creation date
6/23/2020 6:53:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />Ao <br />4 Whk <br />'10r4RC0 Products t <br />Station # 5 2C — <br />Address <br />6 <br />Mechanical Data Sheel <br />Test hdormation <br />Replaced All Failed Leak Detectors Yes No N/A <br />If No, Replacement To Be Completed By (Date) L L . <br />This letter certifies that the annual leak detector tests were performed at -the above ref=uced facility <br />according to the equipment manufacturers procedures and limitations and the results as listed are to my <br />knowledge true and correct. The mechanical leak detector test pass/fail is determined using a low flow <br />threshold trip rate of 3 gph at 10 PSI, <br />Inspected By: Contracto <br />Signature <br />APamz8 ON) <br />E/E'd M7*ow 03 11039 WdST:6 2002'SZ'AUW <br />Full Operating Pressure (psi) <br />at <br />LAW <br />PASS or FAEL <br />Replaced All Failed Leak Detectors Yes No N/A <br />If No, Replacement To Be Completed By (Date) L L . <br />This letter certifies that the annual leak detector tests were performed at -the above ref=uced facility <br />according to the equipment manufacturers procedures and limitations and the results as listed are to my <br />knowledge true and correct. The mechanical leak detector test pass/fail is determined using a low flow <br />threshold trip rate of 3 gph at 10 PSI, <br />Inspected By: Contracto <br />Signature <br />APamz8 ON) <br />E/E'd M7*ow 03 11039 WdST:6 2002'SZ'AUW <br />
The URL can be used to link to this page
Your browser does not support the video tag.