My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2023 11:46:22 AM
Creation date
6/23/2020 6:53:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 R <br /> Board&Software Replacement Before Turning Off Power-All Procedures <br /> 2 Remove the grounding wrist strap from <br /> its package and wrap one end around ,. <br /> your wrist. Ahere the other end to the <br /> side of the comm board cage. <br /> Pivot edge of tool <br /> against inner partition <br /> �IwWUWQm.ePs CPU Board of console. <br /> 4 A Place curved end of the removal <br /> tool under front end of CPU board at <br /> each retention pin location(3 places) <br /> and rotate tool to pry the board <br /> off of the retention pin. Replace <br /> A �; removal tool in its storage position. <br /> CPU Board Installation guide ,_ <br /> slots(one at top and bottom) an wi <br /> Retrieve Board Removal <br /> tool from its storage <br /> position on the top of the Pull the board straight out until you disconnect <br /> comm cage by pulling on W,, it from the motherboard connector and it <br /> black knob in center of clears the top and bottom guides. Rotate it <br /> tool. towards you to clear the door. Hold the CPU <br /> board by its edges and avoid touching <br /> components and connector pins. <br /> Disconnect each of the two cables <br /> attached to the CPU board,and the ' <br /> printer cable from the Local Printer o5 :. <br /> Com Board. <br /> Remove ac power to the <br /> console. Push S2 down to <br /> turn battery backup OFF. <br /> BATT( OPEN`.. <br /> Figure 2. Removing CPU Board <br /> 5. Place old and new CPU boards side by side on a clean work surface.Make sure the Battery Backup switches on <br /> both boards are in the Off position.Remove the SEM(see Figure 17 on page 29) and the PROM chips(see page <br /> 17)from the old CPU board and plug them into the identical sockets on the new CPU board. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.