My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2023 11:46:22 AM
Creation date
6/23/2020 6:53:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�8 5450:161't W FTLEMONT,STOCKTON,CA 95203 Date of TestrnglSemcing 6/8/2005 <br /> F. In-Tank Gauging ISM Equipment: Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging egiupment is used to perform leak detection monitoring. <br /> Ca lets the folio ' cke ° t: <br /> Yes No* Has all input -begninspectedforproperentryandt anon,includingtesting for ground faults? <br /> Yes hs No* Were all tank gauging probe yspectedf age and residue buildup? <br /> Yes No* Was accuracy of system pro duct leve stasted? <br /> Yes No* Was accuracy of system water le adirtgs t <br /> Yes No* Were all probes reinst roperly? <br /> Yes No* Were all ite a equipment manufactarer's maintenance ch-ow t carupleted? <br /> *In the Section H,below-,-65scribe kow and when&we deficimmics wear or will be ea ted. <br /> C. Line Leak,Detectors (LLD): . . Checkthis boxifLLAs are notinnstalled. <br /> Com late tke folio checklist <br /> Yes No* For equipment startup or annual equipme t certification, was a leak simulated to Verify LLD performance? <br /> NIA (Check all thatapply) Simulated leak rate: ,3 g.p.h.i; .0.1 g.p.h?a 0.2 g.p.h? <br /> Notes: 1. Required for equipment startup certification annual cerMcatson. <br /> 2, Unless mandated by local agency,certification required only for electronic LLD startup. <br /> Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes No* Was the testing appuaftw properly calibrated? <br /> Yes No* Formech 'col s,does the restrictproductflowifit detects ala <br /> NIA <br /> Yes No* For electronic LLD9,does the turbine automatically shut off if the detects aleek? <br /> NIA <br /> Yes No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> NIA or disconnected? <br /> Yes No* For electronic LLDs, does the turbine automatically shut off if anyportion of the monitoring system maMinctions <br /> NIA or fails a test? <br /> Yes No* For electronic LLDs,have elk accessible wising connections been visually inspected? <br /> NIA <br /> Yes No* Ware all items on the equipment manufacturer's maintenance checklist complete d? <br /> *In the Section H,below,describe kow and wken tkese deficiencies men or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03Al <br />
The URL can be used to link to this page
Your browser does not support the video tag.