Laserfiche WebLink
May-20-08 09:39am From-uettler-Rq nc i—ois r uuo/uuo r—coo <br /> F. In-Tank Gauging/,SIR quipment., 0 Check this box if tank gauging is used only for inventory cont, <br /> 0 Check this box if no tank gauging or SIR equipment is install,,, <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoririg. <br /> Complete the following checklist: <br /> C1 <br /> (3 yes El No* Has all input W1 iring been inspected for proper entry and termination,including testing for ground faults''Y, <br /> Cl yes C1 Now Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Zl yes _N <br /> o* Was accuracybf system product level readings tested? <br /> Yes <br /> s_ —No Was accuracy bf system water level readings tested? <br /> Q Yes <br /> ICl yes 0 No* Were all probe's reinstalled properly? <br /> C) Yes L3 I No* Were all items'on the equipment manufacturer's maintenance checklist completed?I I <br /> In the Section H,below,describd how and when these deficiencies were or will be corrected. <br /> G. Lioe Leak Detectors (L) D): Cl Check this box if LLDs are not installed. <br /> Complete the following checklist: 1 <br /> Qes 1 <br /> *4 <br /> yes Q No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performano <br /> 0 N/A (Check all that apply) Simulated leak rate.* g.p.h.; 0 0.1 g.p.h ; C10.2 g.p.h. <br /> 7%r <br /> y <br /> Yes (3 No* Were all LLDs'confumed operational and accurate within regulatory requirements? <br /> I C1 --- <br /> Yes No* Was the,testis apparatus properly calibrated? <br /> yes <br /> Yes L3- <br /> No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> 0 <br /> Yes Na* —For electronic ii.L_Ds,does the turbine automatically!a off if the LLD detects akakT____ <br /> Ii <br /> 0 N/A <br /> 0 Yes 13 No* For electronic 4LDs, does the turbine automatically shut off if any portion of the monitoring system Is—disable <br /> "WN/A or disconnected? <br /> rOY." ---(j_jTO—o For electronic [EEDs, does the turbine automatically shut off ifanyportion of the monitoring syster <br /> )Ef N/A malfunctions or,fails a test? <br /> Ds,have all accessible wiring connections been visually inspected? <br /> ZZ:Yes <br /> ;Elz�Yes 0 Na* For electronic <br /> 0 N/A <br /> [3 yeaj. C3=Were all itemsnthe equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe Opw and when these deficiencies were or will be Corrected. <br /> -VAR I /901V <br /> H_ cornfnents: S, k-S fi <br /> 4- <br /> llage'j of 3 <br />