My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2009-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 2:05:50 PM
Creation date
6/23/2020 6:54:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2011
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2009-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />SWRCB, January 2002 Page of <br />r. arxr Y tlY[7�, asr.Tff'1' r !'�fl7ET{' A riUlUi6PR7'B' Rf��"i..6' <br />Facility is Not Equipped With S ill/Overfill Containment Boxes ❑ <br />SpiWOverBR Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ❑ industry Standard ❑ Professional Engineer <br />❑ Other (Specie) <br />Test Method Used: ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: ELLDS Equipment Resolution: .0007 <br />Bucket Diameter: J <br />K.. <br />Spill Box # <br />.. - <br />.77—Spill Bax #qff fl Spill Box # Spill Box # <br />2 . <br />/ 1 Z <br />Bucket Depth: <br />jjj/2 <br />`�/ <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 minutes <br />30 minutes 30 minutes 30 minutes <br />Test Start Time: <br />Initial Reading <br />6`J%f Co 1.4-Yr7_ <br />. oj- aSrS!• s 4C) '• SX <br />Test End Time: <br />2 7Z <br />//.'27 ,0 'r Z //-'22 <br />Final Reading (RF): <br />P« G. `Y . &. 7_ <br />x> . 033Y <br />Test Duration: <br />15 sites <br />15 nunutes 15 m utes 15 Utes <br />Cbange in Reading OtF""= <br />AD®t 3 <br />.mom®Y7 . oP® 2 ®®f/ , ®�// <br />Pass/Fail Threshold or <br />Criteria <br />0.0020 <br />0.0020 0.0020 0.0020 <br />Test Result: <br />,Pass ❑ Fail <br />Pass ❑ Fail M -Pass ❑ Fail ❑ bass ❑ Rail <br />Co mm ents (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />Arco 005450 <br />1617 W. Fremont <br />Stockton, Ca <br />Nick Barvey <br /># 10073 S8 989 <br />
The URL can be used to link to this page
Your browser does not support the video tag.