Laserfiche WebLink
Ga1rfiE�R=�rAM lye, <br /> DR Job tM 20 64 V,,-`4 <br /> D, Resulle of Teetine/iervioln® <br /> @@%of@ Version Installed' _ 330,00 <br /> Com kite the tollowin cheeklistl <br /> s e audible alarm operational? <br /> iZ es p o is the visual alarm operational? <br /> fY es p o Were all Sensors vlsuaily Inspeoled,functionally tested,and confirmed operational? <br /> e$ C o were oil sensors Installed of owes point or secondary containment and positioned so that other equipment not Interfere with a r <br /> proper o erallon? <br /> Q es 13 o alarms are relayed to a remote monitoring station,Is all communication equipment(e.g,modem)operational? <br /> 17 WA <br /> Q es o or pressurized piping sys ems,do@*the turbine automatically shuT40—"Iftho piping secon ary eontalnmeni mon or ng system <br /> N/A detects a leek,falls to operate,or is electrically disconnected?If yes;which sensors initiate positive shut-down?(Check all that app/y) <br /> 13 Sump/Trenoh Sensor, E3 Dispenser Containment Sensor.Did you confirm positive shut-down due to leaks AM sensor <br /> fallure/dlsconnection? 1Y Yes; [3 No, <br /> Yes 13 Ne i For tank a s that utilize the monitoring system as the primary tank overfill warning device ,e,no mechanical overfill prevention <br /> 13 N/A valve Is installed),is the overfill warning alarm visible and audible at the tank 811 point($)and operating properly?If so,at what percent <br /> of tank capacity does the alarm trigger? _,_SO 1% <br /> 13 e$ –S-70— Was any monitoring equipment rep ace yes,lden specific sensors,probes,or other equipment replaced and listthe' <br /> manufacturer name and model for all replacement rts In Section E below, <br /> 13 es o a$liquid foundns a any secondary containment systems designed as dry systems (Check all thatappy) (]Product; 0 Water. If <br /> Yes,describe causes In Section E,below, <br /> Yes 1 13 NWas monitoring System set-up reviewed to Insure proper settings?Attach set-up reports,If applicable. <br /> as o' Is all monitorin ul mentoperational=nufacturela specifications? <br /> •In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Cerfification Page 2 of 4 12107 <br /> 2 <br />