My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2014-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 2:13:24 PM
Creation date
6/23/2020 6:54:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2017
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\1617\PR0231923\UST RETROFIT PLAN 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GETTIM-RYAN INC. GR Job# 17202518 <br /> F. In-Tank Gauging I SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Has all input wiring been inspected forproper en and termination,including testing for rofilults? <br /> � es ❑ o P 9 P entry 9 9 9 <br /> IS Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Q Yes ❑ No* Was accuracy of system products level readings tested? <br /> IX Yes ❑ No* Was accuracy of system water level readings tested? <br /> C[ Yes ❑ No* Were all probes reinstalled properly? <br /> Ig Yes 1 ❑ No* lWere all items on the equipment manufacturer's maintenance checklist completed? <br /> ' n the Section R,Felow,describe how and when W—m'deficlencles were or will be corrects <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the foilowing checklist: <br /> 1Z Yes ❑ o or equipment start-up or annual equipment certifi on,was a leak simulated o venly LLD performance?( (check all <br /> ❑ NIA that apply)Simulated leak rate: ® 3 g.p.h. ❑ 0.1 g.p.h. ❑ 0.2 g.p.h. <br /> IH Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Ig Yes [] No' Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No* For Mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> (g NIA <br /> Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> Yes ® No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> ❑ N/A Disconnected? <br /> Ig Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑ N/A fails a test? <br /> Ig Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> Ig Yes ❑ No' were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe ow and when these de ciencles were or will be co <br /> G. Comments: <br /> Monitoring system Certification Page 3 of 4 12107 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.