Laserfiche WebLink
..� _ ,' <br /> 16 L- <br /> SWRCB,JanuaryJUN 20`6 <br /> 2002 Page_3_of^7 <br /> 5. SECONDARY PIPE TEST„INQ v oo ' ” <br /> Test Method Developed By: ❑ Piping Manufacturer ®Industty$ a Af- Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:0—15 PSI GAUGES Equipment Resolution .5% <br /> . Piping Run#87 Piping Run#87 Piping Run#91 Piping Run It <br /> MAIN _ MANIFOLD <br /> Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: A.O.SMITH A.O.SMITH A.O.SMITH <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: 80' 15' 100' <br /> Product Stored: 87 87 91 <br /> Method and location of TEST BOOT! TEST BOOT 1 TEST BOOT 1 <br /> piping-run isolation: STP SUMP STP SUMP STP SUMP <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MIN 15 MIN 15 MIN <br /> starting test: <br /> Test Start Time: 10:45 10:45 9:00 <br /> Initial Reading(Ri): 5.0 PSI 5.0 PSI 5.0 PSI <br /> Test End Time: 11:45 11:45 10:00 <br /> Final Reading(RF): 5.0 PSI 5.0 PSI 5.0 PSI <br /> Test Duration: 1 HR 1 HR 1 HR <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or NO LOSS NO LOSS NO LOSS NO LOSS <br /> Criteria: <br /> Test Result: ®Pass ❑ Fail ED Pass ❑Fail 0 Pass ❑Fail ❑Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> REPLACED BOOTS FOR BOTH 87 MAIN SECONDARY LINE AND 87 MANIFOLD SECONDARY LINE AT 87 MAIN <br /> TURBINE SUMP. <br /> BOTH BOOTS WERE RIPPED.MODIFIED 87 MAIN BOOT IN ORDER TO FIT PIPE <br />