My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2014-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 2:13:24 PM
Creation date
6/23/2020 6:54:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2017
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\1617\PR0231923\UST RETROFIT PLAN 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GETTLFR-RYAN INC. GR Job <br />D. Results of Testing/Servicing <br />Software Version Installed: 332.00 <br />CamnlMte the fallowlna eheckllat- <br />f . t <br />f <br />Yes <br />❑ o <br />Is the audible alarm operational? <br />EL- <br />Yes <br />❑ No' <br />Is the visual alarm operational? <br />rx <br />Yes <br />❑ No' <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />[L- <br />Yes <br />❑ No` <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br />ro er operation? <br />Yes <br />❑ No' <br />If alarms are relayed to a remote monitoring station, is all communication equipment (e.g. modem) operational? <br />❑ N/A <br />ji <br />Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containme=nt monitoring system <br />❑ N/A <br />detects a leak, fails to operate, or is electrically disconnected? if yes: which sensors initiate positive shut -down? (Check all that apply) <br />Ia Sumpfrrench Sensor, 9 Dispenser Containment Sensor. Did you confirm positive shut -down due to leaks and sensor <br />failure/disconnection? (g Yes; ❑ No. <br />g <br />Yes <br />❑ No" <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention <br />❑ WA <br />valve is installed), is the overfill warning alarm visible and audible at the tank fill points) and operating properly? if so, at what percent <br />of tank capacity does the alarm trigger? _--20_% <br />❑ <br />Yes <br />g No <br />Was any monitoring equipment replaced? if yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all re acement parts in Section E, below. <br />❑ <br />Yes <br />(L- No <br />Was liquid found Inside any secondary containment systems designed as dry systems? (Check all that apply) []Product; ❑ Water. if <br />yes, describe causes in Section E, below. <br />Yes <br />[3 No" <br />Was monitoring system set-up reviewed to insure proper settings? Attach set-up reports, if applicable. <br />jj <br />Yes <br />❑ No' <br />Is all monitoring equipment operational per manufacture's specifications? <br />- in aecbon r- oenow, oescnoe now ano when mese aencnencnes were or wnn ce correctea. <br />E. Comments: <br />Monitoring System Certification Page 2 of 4 <br />19 <br />12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.