Laserfiche WebLink
R In -Tank Gauging / SIR Equipment: <br />f Ch<x c this box if tank gauging is used only for inventory Control <br />®- C&ck this box if no tank ganging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the followirw cheddist: <br />❑ Yes . ❑ No* Has all input wiring been inspected for proper catty and termination; includingusting for ground faults? - <br />❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup?-- — - - <br />❑Yes ElNo* Was accuracy of system product level readings tested? <br />13Yes 13No* 'Was accuacy of system water level readings tested? <br />❑ Yes E3No* Were all probes reinstalled paopaiy? <br />C3 Yes ❑ No* Were all iters on the cquipmeat manufacdnr s maintenance checklist completed? <br />* In the Section K below, descn"be how and when these deficiencies were or will be cocrec" <br />OFMI. Moat <br />r�. r �� l r� r .• <br />to rue becuoa H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />