Laserfiche WebLink
WRITTEN MONITORING PROCEDURES <br />O. <br />DOUBLE CONTAINMENT UNDERGROUND STORAGE <br />These written procedures are required by California UST Regulations, Section 2632(d)(1), must <br />be maintained at the UST location at all times, and are a condition of the operating permit. <br />Quik Stop Market #148 <br />205 West Lockeford Street <br />Lodi, California 95240 <br />The gasoline storage and dispensing system at this location consists of two (2) 10,000 gallon and <br />one (1) 8,000 gallon double-wall fiberglass, dry -interstitial, underground storage tanks serving <br />two (2) double -sided multi -product dispensers (MPDs). Product lines are double-wall fiberglass. <br />A. Annular space of tanks and product lines are monitored continuously by electronic <br />probes. Dispenser pans have float mechanisms that trigger shear valve shut-off. <br />B. The Gilbarco EMC Tank and Line Monitoring System is manufactured by Veeder-Root. <br />Leak conditions trigger visual and audible alarms located on the monitoring system <br />control panel. Turbine shutdown will occur if either power is lost to the control panel or <br />if the turbine sump probe(s) sense leak conditions. <br />C. The monitor control panel is located in the market office. The monitor is placed in test <br />mode daily to check alarm function. Results are recorded on a "Daily Monitoring System <br />Inspection Log". <br />D. Monitoring is the responsibility of Inder eet S. and Baljit K. Kang, Franchisees, or their <br />designated duty clerk. Maintenance of the monitoring equipment is the responsibility of <br />Quik Stop Markets, Inc. Required work will be authorized by Mike Karvelot, Director <br />of Environmental Affairs. <br />E. If an alarm occurs, the Franchisee will immediately contact the Quik Stop Gasoline <br />Department, which will in turn dispatch a qualified service contractor to the site. The <br />service contractor will determine the cause of alarm and advise Quik Stop of site <br />conditions. If an unauthorized release to secondary containment has occurred, action will <br />be immediately taken to implement the attached Written Response Plan. <br />F. The monitoring panel, interstitial probes, product lines, and mech. LDs are tested/certified <br />annually. Preventive maintenance is scheduled annually in conjunction with certification. <br />G. A description of the gasoline system operation and operator's responsibilities are <br />discussed in the Franchise Agreement. Initial training in operation of the tank system and <br />monitoring equipment is conducted "on the job" under the supervision of Quik Stop <br />personnel. <br />