My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_1986-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:44:53 PM
Creation date
6/23/2020 6:54:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2003
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_1986-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY <br />LINE TESTING <br />Test Method By: <br />Test Method Uses: <br />Measuring Equipment Used: <br />Manufacturer <br />Pressure <br />Pressure Gauge <br />• Industry Standard <br />vacuum <br />(range 0 to 10 psig) <br />Professional Engr. Other (see below) <br />Hydrostatic Other (see below) <br />Description <br />Line #1 <br />Line #2 <br />Line #3 <br />5 <br />Pipe manufacturer <br />Smith <br />Smith <br />SmithPipe <br />9:40 AM <br />Final pressure (psig) <br />material <br />FRP <br />FRP <br />FRP <br />1:00 <br />1:00 <br />Primary pipe diameter (inches) <br />2" <br />7' <br />Z. <br />0 <br />Pass/Fail threshold (psig) <br />Secondary pipe diameter (inches) <br />3" <br />3" <br />3" <br />PASS <br />PASS <br />Tank product <br />Gasoline - 87 <br />Gasoline - 89 <br />Gasoline - 91 <br />Method of secondary pipe isolation <br />Clam Shell <br />Clam Shell <br />Cpm Shelf <br />Location of secondary pipe isolation <br />Sump <br />Sump <br />Sump <br />Estimated length of piping run (feet) <br />65 <br />70' <br />55' <br />includlength <br />Wait time for pressure to stabilize (hrmin) <br />Comments: <br />0:05 <br />0:03 <br />0:02 <br />Test start time <br />8:50 AM <br />8:45 AM <br />8:40 AM <br />Initial pressure (psig) <br />5 <br />5 <br />5 <br />Test end time <br />9:50 AM <br />9:45 AM <br />9:40 AM <br />Final pressure (psig) <br />5 <br />5 <br />5 <br />Test duration (hr:min) <br />1:00 <br />1:00 <br />1:00 <br />Change in pressure (psig) <br />0 <br />0 <br />0 <br />Pass/Fail threshold (psig) <br />0.5 <br />0.5 <br />0.5 <br />e of branch runs <br />PASS <br />PASS <br />PASS <br />Wait time for pressure to stabilize (hrmin) <br />Comments: <br />0:05 <br />0:03 <br />0:02 <br />Test start time <br />8:50 AM <br />8:45 AM <br />8:40 AM <br />Initial pressure (psig) <br />5 <br />5 <br />5 <br />Test end time <br />9:50 AM <br />9:45 AM <br />9:40 AM <br />Final pressure (psig) <br />5 <br />5 <br />5 <br />Test duration (hr:min) <br />1:00 <br />1:00 <br />1:00 <br />Change in pressure (psig) <br />0 <br />0 <br />0 <br />Pass/Fail threshold (psig) <br />0.5 <br />0.5 <br />0.5 <br />TEST RESULT <br />PASS <br />PASS <br />PASS <br />2003 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.