My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_1986-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:44:53 PM
Creation date
6/23/2020 6:54:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2003
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_1986-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />11 <br />ONITO G SYSTEM CERTIFICATION <br />For Use By All Jurisdictions Within the State of California <br />Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations <br />This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be prepared <br />for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank <br />system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems within 30 <br />days of test date. <br />A. General Information <br />Facility Name:,,w�a C <br />Site Address: <br />Bldg. No.: <br />Q <br />City: i Zip: I _ <br />Facility Contact Person: ® W eY` Contact Phone No.: (qCCA ) `D <br />Make/Model of Monitoring System: nL... Date of Testing/Servicing: I / <br />B. Inventory of Equipment Tested/Certified <br />Check the aoorooriate boxes to indicate specific equipment inspected/serviced: <br />Tank ID: <br />Tank ID: <br />In -Tank Gauging Probe. <br />Model: Aa <br />In -Tank Gauging Probe. Model: <br />Annular Space or Vault Sensor. <br />Model: <br />Annular Space or Vault Sensor. <br />Model: <br />Piping Sump / Trench Sensor(s). <br />Model: <br />Piping Sump / Trench Sensor(s). <br />Model: <br />Fill Sump Sensor(s). <br />Model: —�- <br />V <br />Fill Sump Sensor(s). <br />Model: <br />Mechanical Line Leak Detector. <br />Model: xQA NAOSa ?t— <br />Mechanical Line Leak Detector. <br />Model: <br />Le <br />❑ Electronic Line Leak Detector. <br />Model: <br />Electronic Line Leak Detector. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Other (specify ui ment type and model in Section E on Page 2). <br />❑ Other (sE22ifX Squiginent type and model in Section E on Pae 2). <br />Tank IID: <br />Tank : <br />❑ In -Tank Gauging Probe. <br />Model: <br />In -Tank Gauging Probe. Model: <br />Annular Space or Vault Sensor. <br />Model: <br />❑ Annular Space or Vault Sensor. <br />Model: <br />Piping Sump / Trench Sensor(s). <br />Model: <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />Fill Sump Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />'* Mechanical Line Leak Detector. <br />Model: tom® <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Other (s i ui ment tXE and model in Section E on Pa a 2). <br />❑ Other (s if Equigment t and model in Section E on Pae 2). <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />'Shear Va]ve(s). <br />E3 Shear Valve(s). <br />r�i <br />&LDis enser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />16 Shear Valve(s). <br />❑ Shear Valve(s). <br />Dis enser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />❑ Shear Valve(s). <br />❑ Shear Valve(s). <br />❑Dis enser Containment Float(s) and <br />Chain(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />*If the f—ility rnntninc mnrr tanks nr dicnensers_ ennv this form. Include <br />information for every tank and dispenser at the facility. <br />C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br />guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this information is <br />correct and a Plot Plan showing the layout of monitoring a utpment. For any equipment capable of generating such reports, I have also <br />attached a copy of the re ort; (check all t apply): kSystem set-up ,Alarm history r ort <br />Technician Name (print): C �� hhe Signature: <br />Certification No.: d� l 1 License. No.: <br />Testing Company Name: Phone NojS_� <br />1- G/�/b� <br />Site Address: �O� OL ��{� Date of Testing/Servicing: <br />Page 1 of 3 03/01 <br />Monitoring System Certification <br />
The URL can be used to link to this page
Your browser does not support the video tag.