Laserfiche WebLink
Ab M <br /> IED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> CERTIFICATION OF INSTALLATION/MODIFICATION <br /> (One form per project.) <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 177 <br /> BUSINESS NAME(Same as FACn.rrY NAME or DBA-Doing Business As) 3. <br /> Quik Stop #148 <br /> BUSINESS SITE ADDRESS 103 CITY 104. <br /> 205 W. Lockeford Street Lodi <br /> H. INSTALLATION/MODIFICATION PROJECT DESCRIPTION <br /> TYPE OF PROJECT(Check all that apply) 413a. WORK AUTHORIZED UNDER PERMIT 483b. <br /> ❑ 1.TANK INSTALLATION OR REPLACEMENT (Number or Date): <br /> ❑ 2.PIPING INSTALLATION OR REPLACEMENT <br /> ❑ 3.SUMP INSTALLATION OR REPLACEMENT <br /> ❑ 4.UNDER DISPENSER CONTAINMENT INSTALLATION OR REPLACEMENT <br /> X 5.OTHER <br /> DESCRIPTION OF WORK BEING CERTIFIED: 483c <br /> The 89 secondary lines failed Tri-Annual Compliance testing on 9-2-09 <br /> Performed Helium Investigation to locate leak on 9-10-09. <br /> Obtain the required permits for this work from the local CUPA.Includes permit fee.Saw out,remove and dispose of the concrete adjacent to the UDC#1/2.. Excavate as required to expose the <br /> secondary line.All backfill spoils to be stockpiled on site for reuse. Make necessary repairs to secondary line 89. Backfill,using existing backfill material. Install new concrete tank slab to match existing, <br /> with#4 rebar as needed. Perform a post-construction SB989 test. <br /> Provide final test results to CUPA and Owner. <br /> III. CONTRACTOR INFORMATION <br /> NAME OF CONTRACTOR WHO PERFORMED INSTALLATION/MODIFICATION 482x. <br /> Walton Engineering, Inc. <br /> CONTRACTOR LICENSE# 4s2b. ICC CERTIFICATION# 482. <br /> 617238 5243762-U1 <br /> IV.CERTIFICATION <br /> I certify that the information provided herein is true,accurate,and that the following conditions have been satisfied: <br /> • The installer has met the requirements set forth in 23 CCR§2715,subdivisions(g)and(h). <br /> • The underground storage tank, any primary piping, and any secondary containment was installed according to applicable <br /> voluntary consensus standards and any manufacturer's written installation instructions. <br /> • All work listed in the manufacturer's installation checklist has been completed. <br /> • The installation has been inspected and approved by the local agency, or if required by the local agency, inspected and certified <br /> by a registered professional engineer having education and ex erience with underground storage tanks stem installations. <br /> SIGNATURE OF TANK OWNER OR OWNER'S AGENT DATE 484. PHONE 487. <br /> (916) 372-1888 <br /> CERTIFIER'S NAME(print) 485 CERTIFIER'S TITLE: 486. <br /> Contractor <br /> NAME OF CERTIFIER'S EMPLOYER(DBA) 488 CERTIFIER'S RELATIONSHIP TO TANK OWNER 489. <br /> Walton Engineering, Inc. ❑ I.TANK OWNER ❑ 2.TANK OPERATOR <br /> ❑ 3.CONTRACTOR ❑ 4.PROPERTY OWNER <br /> X 5.OTHER AUTHORIZED AGENT OF TANK OWNER <br /> UPCF UST-C-1/2 Rev.(12/2007) <br />