My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 8:15:16 AM
Creation date
6/23/2020 6:54:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2015
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_2010-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> ITTEN PROCEDURES &BEST MANAGEMENT PRACTICES <br /> FOR MONITORING <br /> DOUBLE CONTAINMENT UNDERGROUND STORAGE TANK SYSTEMS <br /> Quik Stop Market#148 <br /> 205 West Lockeford Street <br /> Lodi, California 95240 <br /> The gasoline storage and dispensing system at this location consists of two (2) 10,000 gallon and <br /> one (1) 8,000 gallon double-wall fiberglass, dry-interstitial,underground storage tanks serving <br /> two (2) double-sided multi-product dispensers (MPDs). Product lines are double-wall fiberglass. <br /> A. Annular space of tanks and product lines are monitored continuously by electronic <br /> probes. Dispenser pans have float mechanisms that trigger shear valve shut-off. <br /> B. The Gilbarco EMC Tank and Line Monitoring System is manufactured by Veeder-Root. <br /> Leak conditions trigger visual and audible alarms located on the monitoring system <br /> control panel. Turbine shutdown will occur if either power is lost to the control panel or <br /> if the turbine sump probe(s) sense leak conditions. <br /> C. The monitor control panel is located in the market office. The monitor is placed in test <br /> mode daily to check alarm function. Results are recorded on a "Daily Monitoring System <br /> Inspection Log". <br /> D. Monitoring is the responsibility of Mota&Raj inder Sanghera, Franchisees, or their <br /> designated duty clerk. Maintenance of the monitoring equipment is the responsibility of <br /> Quik Stop Markets, Inc. Mike Karvelot, Director of Environmental Affairs, will <br /> authorize all repairs. <br /> E. If an alarm occurs, the Franchisee will immediately contact the Quik Stop Gasoline <br /> Department, which will in turn dispatch a qualified service contractor to the site. The <br /> service contractor will determine the cause of alarm and advise Quik Stop of site <br /> conditions. If an unauthorized release to secondary containment has occurred, action will <br /> be immediately taken to implement the attached Simplified Response Plan. <br /> F. The monitoring panel, probes, LLDs are tested/certified annually in August. Preventive <br /> maintenance and spill bucket testing is scheduled annually in conjunction with monitor <br /> certification. SB-989 testing is conducted tri-annually in December('03, '06, '09, etc). <br /> G. A description of the gasoline system operation and operator's responsibilities are <br /> discussed in the Franchise Agreement. Initial training in operation of the tank system and <br /> monitoring equipment is conducted "on the job" under the supervision of Quik Stop <br /> personnel and the Designated UST Operator. <br />
The URL can be used to link to this page
Your browser does not support the video tag.