Laserfiche WebLink
0 o RECEIVED <br /> UST SYSTEM RETROFIT OR REPAIR NOV 2 0 2014 <br /> (Submit minimum of 3 sets of plans&applications as originals will be reta' D <br /> 1. Site map enclosed? YES [A NO [] DEPARNEW <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Repair 87 STP piping sump electrical Penetration with Bravo F-Series F-07 Retrofit boot. Make <br /> repairs to the 87 and 91 secondary line using Bravo's flex hoots for the shallow Bravo IJDC"c <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> Bravo F-Series F-07 Retrofit-2045-S-RND <br /> Bravo Flex Boot <br /> 3 <br />