Laserfiche WebLink
-M AdhL <br /> SAN JOAQW COUNTY ENVIRONMENTAL HEALTNWPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN- PAGE 1 (One form per facility) <br /> TYPE OF ACTION 1.NEW FORMAT ❑ 2.CHANGE OF INFORMATION Rol. <br /> 2 <br /> FACILITY ID# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) Roz. <br /> QUIK STOP MARKET#148 <br /> BUSINESS SITE ADDRESS R03. CITY Roo. <br /> 205 W. LOCKEFORD STREET LODI CA 95240 <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity,has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous ornon-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deteriorationif any of the following conditions occur: <br /> I. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> g , ► <br /> s. - ;7 x <br /> L <br /> s 4 � pax k t"#' T §H y <br /> ;�`,.,, <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete nly ifapplicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO. R20. R30. <br /> R11. R21. R31. <br /> R12. R22. R32. <br /> R13. R23. R33. <br /> R14. R24. R34. <br /> R15. R25. R35. <br /> THE FOLLOWING PERSON(S) <br /> IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40 TITLE R50 <br /> Mike Karvelot Director of Environmental Affairs <br /> NAME R41. TITLE R51. <br /> Debbie Markovich Director of Petroleum <br /> NAME R42. TITLE Rs2. <br /> Chris Wright Director of Construction&Maintenance <br /> NAME R43. TITLE R53. <br /> Sami Alkoussa District Advisor <br /> Al <br /> .. •. u r <br /> �. <br /> F MONITORING INDICATES A POSSIBLE UN4UTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: R60. <br /> WrAdditional system testing or data collection ll9 Inspection by qualified persons [recalibration of equipment <br /> ther: <br /> Follow the steps as outlined in the accompanying "Simplified Response Plan for the Removal of an <br /> Unauthorized Release From the Interstitial Space of Double-Containment UST Systems". <br /> UST Response Plan(3/2008)-1/3 <br />