My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 8:15:16 AM
Creation date
6/23/2020 6:54:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2015
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_2010-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONIT ING SYSTEM CERTIFOATION <br />CERTIFICATION / TEST DATE: Mav 05, 2014 <br />F. IN -TANK GAUGING / SIR EQUIPMENT: ❑ Check this box if tank gauging is used only for Inventory control. <br />❑ Check this box if no tank gauging or SIR equipment Is Installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />Yes <br />ElNo* <br />� <br />❑ <br />Yes <br />❑ <br />Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />No * <br />Was accuracy of system product level readings tested? <br />13 <br />Yes <br />❑ <br />No * <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No * <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />El <br />No * <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑ Yes <br />ElNo* <br />El <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ Yes <br />❑ No* <br />El <br />N/A <br />or disconnected? <br />El <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />El <br />N/A <br />or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />El Yes <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />n Section H below, describe how and when these deficiencies were or will be corr <br />Yes <br />ElNo* <br />� <br />❑ <br />Yes <br />❑ <br />No * <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />El <br />Yes <br />❑ <br />No * <br />Was accuracy of system product level readings tested? <br />13 <br />Yes <br />❑ <br />No * <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No * <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />El <br />No * <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />G. LINE LEAK DETECTORS (LLD): El Check this box if LLDs are not installed. <br />Complete the following checklist: <br />❑ <br />Yes <br />ElNo* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />El <br />N/A <br />(check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />El <br />Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />El <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />El <br />Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product flow If it detects a leak? <br />[I <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ Yes <br />ElNo* <br />El <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ Yes <br />❑ No* <br />El <br />N/A <br />or disconnected? <br />El <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />El <br />N/A <br />or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />El Yes <br />❑ No* <br />❑ <br />N/A <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑ Yes <br />❑ No* <br />H. COMMENTS <br />Page 3 of 3 <br />ected. <br />
The URL can be used to link to this page
Your browser does not support the video tag.