Laserfiche WebLink
0 <br />IN <br />• Furnish and install a new Veeder-Root BIR Protocol DIM <br />module <br />• Perform a "cold start" of the Monitoring System, including <br />the ISD mapping and turning over the sensors to create a <br />history. <br />• Perform a formal Monitoring System Certification with a <br />report to the local CUPA. <br />U <br />J W. Lockeford St. <br />Legend <br />G Gasoline - 87 <br />• Gasoline - 89 <br />• Gasoline - 91 <br />O Diesel <br />• Vapor <br />O Annular <br />• Submersible Turbine Pump <br />0 TLM Probe <br />Monitoring System Panel <br />8 Emergency Shut -Off Switch <br />Q Overfill Alarm <br />4 Float & Chain <br />E3 Sump/UDC Sensor <br />Interstitial Sensor <br />Vacuum Sensor <br />O Line Leak Detector <br />ISD Flow Meter <br />ISD Pressure Sensor <br />(Do Spill Containment Kit <br />e <br />N <br />N <br />N <br />N <br />o <br />Z <br />_ <br />m o <br />— <br />o <br />so <br />00 <br />Y <br />a C'4 <br />-- <br />cCLC <br />� rn <br />-- <br />C <br />U12 Q <br />(� <br />Q <br />O <br />J <br />0 <br />— <br />ui <br />J <br />- <br />Y <br />0 <br />0 <br />N <br />/y <br />