Laserfiche WebLink
SECONDARY LINE TESTING <br /> Test Method By: o Manufacturer • Industry Standard o Professional Engr o Other(see below) <br /> Test Method Uses: • Pressure o vacuum o Hydrostatic o Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range Q to 15 psig) <br /> Description Line#1 Line#2 Line#3 <br /> Tank product Gasoline-87 Gasoline-89 Gasoline-91 <br /> Pipe manufacturer Smith Smith Smith <br /> Pipe material FRP FRP FRP <br /> Primary pipe diameter (inches) 2 2 2 <br /> Secondary pipe diameter (inches) 3 3 3 <br /> Method of secondary pipe isolation Clam Shell Clam Shell Clam Shell <br /> Location of secondary pipe isolation STP STP STP <br /> Estimated length of piping run (feet) 50 50 50 <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hr:min) :15 :15 :15 <br /> Test start time 10:00 AM 10:02 AM 10:04 AM <br /> Initial pressure (psig) 5.0 5.0 5.0 <br /> Test end time 11:00 AM 11:02 AM 11:04 AM <br /> Final pressure(psig) 5.0 5.0 5.0 <br /> Test duration (hr:min) 1:00 1:00 1:00 <br /> Change in pressure (psig) 0.0 0.0 0.0 <br /> Pass/Fail threshold (psig) 0.5 0.5 0.5 <br /> TEST RESULT PASS PASSPASS <br /> Comments: <br /> Inspector required 89 secondary line to be tested. <br /> I L.%j L.I V LE. <br /> L-1 19®il t 1 , <br /> a�r-A I-rg t F%r-MA rl-mgr g a r <br /> ® 2014 Walton Engineering,Inc. <br />