Laserfiche WebLink
Nov 28 00 09: 36a Mike Brown 209-461-6342 P. 1 <br /> 0 0 PAO, 11 OF 20 <br /> Executive order -70-177, F_Xhibjt 2, page 6 <br /> 3. Spill contairwnent manholas which have drain valves shall be maintained in leak-tight, <br /> -condflion. Manholes with oover-aCtuated drain vaives shaft not be used In new installations <br /> (as defined above). Drain valves may be removed and removed and the pod plugged <br /> provided On alternate method of draining the spill container is defined (i.e., a hand purnp <br /> maintained at the facility and/or on the product delivery trucks). <br /> 4. The Phase I vapor recovery system shall be operated during product deliveries so 2S to <br /> minimize the loss of vapors from the facility storage tank which may be under pressure, <br /> There shall be no less than one vapor return hose connected for each product being <br /> delivered. Provided it is net in conflict with established safety procedures, this may he <br /> acc;omplished in the following manner: <br /> For two-point F"hp-se- I syslems, the vapor return hoss is connected to the delivery <br /> to and to the defively'elbow before the elbow is connected to the facifity storage <br /> tank-, <br /> Ia ��D <br /> NOV 2 8 2000 <br /> ENVIRONMENT 8EALTH <br /> PER&IITISE13 VICES <br />