Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1.FACILITY INFORMATION <br /> Facility Name: TWO GUYS FOOD&FUEL I Date of Testing: 7-16-2014 <br /> Facility Address: 147 E LATHROP RD LATHROP CA 95330 <br /> Facility Contact: GREG Phone: 209-858-2666 <br /> Date Local Agency Was Notified of Testing:6-25-14 <br /> Name of Local Agency Inspector(ifpresent during testing): ARIS SJV <br /> 2.TESTING CONTRACTOR INFORMATION <br /> Company Name: AFFORDA TEST 4162 d Street Galt,CA 95632 (209)744-0112 Fax: (209)744-0116 <br /> Technician Conducting Test: ❑ Lyle D.Nimmo ❑ Zane A.Nimmo ❑X David A.Winkler Felix G.Ramirez <br /> 5249115-UT 5263322-UT 5263373-UT 5273934-UT <br /> Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ®Hydrostatic ❑ Vacuum ❑ Other <br /> Test Equipment Used: TAPE/H2O Equipment Resolution: 1/16 <br /> r. „ .,, a r,,.. � ,.,,,.,. . ..,.... �; <br /> Identify Spill Bucket(By Tank 1 87 2 91 3 DIE 4 <br /> Number, Stored Product, etc.) <br /> ®Direct Bury ® Direct Bury ®Direct Bury F]Direct Bury <br /> Bucket Installation Type: FI Contained in <br /> El Contained in Sump El Contained in Sump ❑Contained in <br /> Sump Sump <br /> ' Bucket Diameter: 11 11 i l <br /> Bucket Depth: 13 13 13 <br /> Wait time between applying _ <br /> vacuum/water and start of test: <br /> Test Start Time(T,): 1000 1000 1000 <br /> Initial Reading(RI): 12 12.50 12 <br /> Test End Time(TF): 1100 1100 1100 <br /> Final Reading(RF): 12 12.50 12 <br /> Test Duration(TF—Tj): 1 HOUR 1 HOUR 1 HOUR <br /> Change in Reading(RF-RI): 0 0 u <br /> Pass/Fail Threshold or 1/16 1/16 1/16 <br /> Criteria: <br /> Test Result: ® Pass ❑Fail 0 Pass []Fail Z Pass ❑ Fail ❑ Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: W .Date:?-16-14 <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor.However, local requirements <br /> may be more stringent. <br />