Laserfiche WebLink
SWRCB, January 2002 <br />Test Method Developed By: <br />Page of <br />5. SECONDARY PIPE TESTING <br />X Piping Manufacturer F! Industry Standard Professional Engineer <br />Other (Spec) <br />Test Method Used: <br />X Pressure <br />_l Other (Spec) <br />C Vacuum <br />I Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Piping Run #1 <br />Piping Run #2 <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run #3 Piping Run # 4 <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />4" x 3" <br />Length of Piping Run: <br />Approx. 120' <br />Approx. 130' <br />Approx. 80' <br />Approx. 150' <br />Product Stored: <br />Regular 87 <br />Super 91 <br />Diesel <br />Gasoline Vapor <br />Method and location of <br />piping -run isolation: <br />Test boot at STP#1 <br />Test boot at STP#2 <br />Test boot at STP#3 <br />Test boot at STP#2 <br />Wait time between applying <br />and starting test: <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />-pressure <br />Test Start Time: <br />8:55 <br />9:05 <br />9:15 <br />9:25 <br />Initial Reading (Rj): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time: <br />9:55 <br />10:05 <br />10:15 <br />10:25 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -R,): <br />0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: X Pass 0 Fail X Pass ` ❑ Fail X Pass ❑ Fail X Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />