My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
147
>
2300 - Underground Storage Tank Program
>
PR0232353
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 2:40:43 PM
Creation date
6/23/2020 6:54:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0232353
PE
2361
FACILITY_ID
FA0003789
FACILITY_NAME
TWO GUYS FOOD & FUEL
STREET_NUMBER
147
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19608071
CURRENT_STATUS
01
SITE_LOCATION
147 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232353_147 E LATHROP_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSAN JOAQUIN COUNTY 0 <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />ZOO Ea <br />V171 -77M7 =i- KPI-MCQUct <br />CONTINUATION FORM <br />Page: 3 of 3 <br />OFFICIAL INSPECTION REPORT <br />Date: 07-08-10 <br />Program: LIST <br />Facility Address: Two Guys Food & Fuel 147 East Lathrop Rd, Lathrop <br />SUMMARY OF VIOLATIONS <br />(CLASS 1, CLASS It, or MINOR -Notice to Comply) <br />UST Inspection: Routine and annual Monitoring System Certification <br /># 18. Spill container failed to contain a minimum capacity of 5 gallons. The 87 product direct bury spill <br />bucket failed the one hour hydrostatic test. The technician had changed the spill bucket cap and <br />tightened the nipple and adaptor but the spill bucket was unable to pass the test. A failure may likely <br />result in release of fuel or vapor to the environment and ground. Immediately, discontinue the deposition <br />of any petroleum into the 87 tank until the component is repaired/ replaced by a properly licensed, <br />trained and certified contractor under permit by SJC EHD. <br />Submit to SJC EHD within 30 days (08-08-10): <br />1. one copy of the completed "Return to Compliance Certification" <br />2. a corrective action statement how the 87 product direct bury spill bucket will be repaired/replaced <br />Notes: <br />• received copy of the Certification of Financial Responsibility and Letter from Chief Financial <br />Officer on-site. CFR & CFO valid from 12/04/09 to 12/04/10. <br />• Secondary containment last performed 12/11/09. The next tri -annual testing is due by 12/2012. <br />ALL EHD STAFF TIME ASSOCIATED wrrH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE ($115). <br />THIS FACILITY ISS _ YBJECT TO REINSPECTION AT NY TIM "T EHD'S CURRENT HOURLY RATE. <br />EHD Inspector: THUY TRAN <br />Received, By <br />Title: <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.