Laserfiche WebLink
°PqutN C <br />?•''��''•Op SAN .lOAQUIN COUNTY <br />2 -err ENVIRONMENTAL HEALTH DEPARTMENT <br />N. 600 East Main Street, Stockton, CA 95202-3029 <br />F. <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility 5 Name: <br />Inspe on ate: <br />�'l� <br />Facility ss ��/ <br />11 <br />Se�r7 st #: <br />D 0 <br />Onservice Technigian's Name: <br />ICC Service Technician/Installer Exp, Date: <br />Soap <br />Manufacturer Training: <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />8106jorm,• <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ <br />❑ electronic Serial #: <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />r <br />CIS <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />8106jorm,• <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />Corrosion protection <br />❑ <br />Other: see below <br />�� U <br />EHD 23-04 <br />Rev 11/1 7//08 <br />UST SERVICE REQUEST INSPECTION REPORT <br />8106jorm,• <br />Inspector - <br />OWN ..1� . iii•. i♦ ' <br />�� U <br />EHD 23-04 <br />Rev 11/1 7//08 <br />UST SERVICE REQUEST INSPECTION REPORT <br />