Laserfiche WebLink
SWRCB, January 2002 Page -7 of <br />9. SPILLJOVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br />SpillJOverfill Containment Boxes are Present, but were Not Tested <br />T�'Method Developed By: 7.Spill Bucket Manufacturer Industry Standard :'I- Professional Engineer <br />Other (Specify) <br />Test Meth(4'Us�d: C Pressure <br />Vacuum Hydrostatic <br />-7 Other (Specify) <br />Test Equipment Used: Fniiinmi-nt Rp,:nfilft nn - <br />S p i I I Spill BOX # Spill BOX # Spill Box # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (111): <br />Test End Time: <br />Final Reading (110: <br />Test Duration: <br />Change in Kedjing (RF -111): <br />Pass/Fail Meshold or <br />Criteria: <br />Test Result: COI Pass MOFail 10 Pass 0 Fail 0 Pass 1OJ Fail!" <br />0 Pass 0 Fail <br />Commonts —!ieclude information on repairs madeprior to testing, and recommended follow-ujE7,r(orfailed test <br />I ere .140,1, <br />