Laserfiche WebLink
WRITTEN MONITORING PROCEDURES <br /> FOR <br /> DOUBLE CONTAINMENT UNDERGROUND STORAGE TANK SYSTEMS <br /> These written procedures are required by California UST Regulations, Section 2632(4)(1),must <br /> be maintained at the UST location at all times, and are a condition of the operating permit. <br /> Quik Stop Market#152 <br /> 1721-1 South Cherokee Lane <br /> Lodi,California 95240 <br /> The gasoline storage and dispensing system at this location consists of two (2) 10,000 gallon and <br /> one(1) 8,000 gallon double-wall fiberglass, dry interstitial, underground storage tanks serving <br /> two(2)double-sided multi-product dispensers(MPDS). Product lines are double-wall fiberglass. <br /> A. Annular space of tanks and product lines are monitored continuously by electronic <br /> probes. Dispenser pans have float mechanisms that trigger shear valve shut-off. <br /> B. The Gilbarco EMC Tank and Line Monitoring System is manufactured by Veeder-Root. <br /> Leak conditions trigger visual and audible alarms located on the monitoring system <br /> control panel. Turbine shutdown will occur if either power is lost to the control panel or <br /> if the turbine sump probe(s) sense leak conditions. <br /> C. The monitor control panel is located in the market office. The monitor is placed in test <br /> mode daily to check alarm function. Results are recorded on a"Daily Monitoring System <br /> Inspection Log". <br /> D. Monitoring is the responsibility of Harbhajan &Devinder Shergill,Franchisees, or their <br /> designated duty clerk. Maintenance of the monitoring equipment is the responsibility of <br /> Quik Stop Markets, Inc. Required work will be authorized by Mike Karvelot,Director <br /> of Environmental Affairs. <br /> E. If an alarm occurs,the Franchisee will immediately contact the Quik Stop Gasoline <br /> Department,which will in turn dispatch a qualified service contractor to the site. The <br /> service contractor will determine the cause of alarm and advise Quik Stop of site <br /> conditions. If an unauthorized release to secondary containment has occurred, action will <br /> be immediately taken to implement the attached Written Response Plan. <br /> F. The monitoring panel, interstitial probes,product lines,and mech. LD are tested/certified <br /> annually. Preventive maintenance is scheduled annually in conjunction with certification. <br /> G. A description of the gasoline system and operator's responsibilities are discussed <br /> in the Franchise Agreement. Initial training in operation of the tank system and <br /> monitoring equipment is conducted"on the job" under the supervision of Quik Stop <br /> personnel. <br />