My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1988-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1721
>
2300 - Underground Storage Tank Program
>
PR0232355
>
COMPLIANCE INFO_1988-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 10:12:50 AM
Creation date
6/23/2020 6:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988-2004
RECORD_ID
PR0232355
PE
2361
FACILITY_ID
FA0000591
FACILITY_NAME
QUIK STOP MARKET #2152
STREET_NUMBER
1721
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
062-060-48
CURRENT_STATUS
01
SITE_LOCATION
1721 S CHEROKEE LN # 1
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232355_1721 S CHEROKEE_1988-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY LINE TESTING <br /> Test Method By: +: Manufacturer • Industry standard •:) Professional Engr. Other(see below) <br /> Test Method Uses: 9 Pressure Vacuum Hydrostatic Other(see ) <br /> Measuring Equipment Used: Pressure Gauge (range o to 10 psig) <br /> Description Line#1 Line#2 line#3 <br /> Pipe manufacturer Smith Smith Smith <br /> Pipe material FRP FRP FRP <br /> Primary pipe diameter (inches) 2" 2" Z. <br /> Secondary pipe diameter (inches) 3" 3" 3" <br /> Tank product Gasoline-87 Gasoline-89 Gasoline-91 <br /> Method of secondary pipe isolation Termination Boot Termination Boot Termination Boot <br /> Location of secondary pipe isolation Sump Sump Sump <br /> Estimated length of piping run (feet) 75' 75 80' <br /> include length of branch runs <br /> Wait time for pressure to stabilize (hr:min) 0:04 0:05 0:05 <br /> Test start time 11:55 AM 12:20 PM 12:10 PM <br /> Initial pressure (psig) 5 5 5 <br /> Test end time 12:55 PM 1:20 PM 1:10 PM <br /> Final pressure(psig) 5 5 5 <br /> Test duration (hrmin) 1:00 1:00 1:00 <br /> Change in pressure (prig) 0 0 0 <br /> Pass/Fail threshold (psig) 0.5 0.5 0.5 <br /> TEST RESULT PASS PASS PASS <br /> Comments: <br /> © 2003 Wagon Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.