My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1988-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1721
>
2300 - Underground Storage Tank Program
>
PR0232355
>
COMPLIANCE INFO_1988-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 10:12:50 AM
Creation date
6/23/2020 6:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988-2004
RECORD_ID
PR0232355
PE
2361
FACILITY_ID
FA0000591
FACILITY_NAME
QUIK STOP MARKET #2152
STREET_NUMBER
1721
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
062-060-48
CURRENT_STATUS
01
SITE_LOCATION
1721 S CHEROKEE LN # 1
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232355_1721 S CHEROKEE_1988-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R In Tank Gauging/SIR Equipment: : Check this box if tank gauging is used only for inventory caontrol. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in:tank gauging equipment is used to perform Ieak detection monitoring. <br /> Com tete the f*Uo'wi cheddist: <br /> ❑ Yes. (3 No* Has all input wiring been inspected for properentry and terminafton.indudingusting for ground fatft) - <br /> ❑ Yes (3 N<)* Were alt tante gauging probes visnany" fordamage and residue buildup?-- — - - <br /> ❑ Yes ❑ No* was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* 'Was aaxiracy of system water level readings tested? <br /> ❑ Yes ❑ No* were au probes reinstalled properly? <br /> ❑ Yes ❑ No* I Were all items on the equipment manufactur-ces ch eddist completed? <br /> *In the Section H,below,describe how and when these de6de*ncies were or will be corm. <br /> G.Line beak Detectors ): ❑ Check this box if LLDs ate not installed. <br /> Complete the folio cheddisL- <br /> Yes ❑ No* For equipment start-up or annual oquip was a leak simulated to verify ILD performance? <br /> ❑ MA (Checkall that aPPll'1 Simulated kakrata 3 g:h; ❑0.1 g p h; ❑02 g p.h. <br /> Yes ❑ No* Were all LIDs confirmed operational and accurate within regulatory requirements? <br /> Yes to No* was the testing apparatus properly calibrated? <br /> PYes <br /> ❑ No* For mechanical LIDS,does the LLD restrict product flow if it detects a leak? <br /> ® NJA <br /> ❑ No* For electtoaic LLDs,dors the turbine automatically shut off if the IID detects a leak? <br /> MA <br /> ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> Cl Cl No* For electronic Lips,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> ❑ No* For electronic LIDS,have all accessible wiring connections been visually inspe(ted? <br /> N/A <br /> Cl No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section$below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> r <br /> Parc of 3 ` � <br />
The URL can be used to link to this page
Your browser does not support the video tag.